Riverbank Energy
200 MW storage in Cook, IL · In queue since March 2020 · Proposed COD May 2024
200 MW
Capacity
1
Components
Battery
6y 2m
In Queue
Feasibility Study
IA Phase
COD target: 2024
Total Duration
4y 2m
Schedule
24 months past proposed COD
Study Phase
TC1
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-05-31
PJM-AF2-441 is a proposed 200 MW battery storage project located in Cook County, Illinois. The project, which is in the PJM interconnection queue, entered the queue on March 31, 2020, with a proposed commercial operation date of May 31, 2024. The project's interconnection status is currently in the Feasibility Study phase.
The proposed project is located within the ComEd service territory. The point of interconnection is the Burnham 138kV substation.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IL
County
Cook
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Lincoln Reserve Energy, LLC
Utility
ComEd
Entity
PJM
Service Type
NRIS
Point of Interconnection
Burnham 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 55 HEGEW138 KV TR71 12
- POI Substation
- ComEd Burnham 138kV-345kV Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Riverbank EnergyForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.