Briefing/projectactive
Riverbank Energy is a 200 MW Battery project in Illinois, currently active.
Lincoln Reserve Energy, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2024-05-31.
- Queue ID
- PJM-AF2-441
- Location
- Cook, Illinois
- Technology
- Battery
- Developer
- Lincoln Reserve Energy, LLC
- Market / region
- PJM
- Point of interconnection
- Burnham 138kV
What stands out
1
Riverbank Energy is a 200 MW Battery project in Illinois with status active.
2
Lincoln Reserve Energy, LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2024-05-31.
Market and operating context
- Queue date
- 2020-03-31
- Proposed COD
- 2024-05-31
- IA status
- Feasibility Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters