Paulding Storage II
50 MW storage in Paulding, OH · In queue since March 2020 · Proposed COD October 2023
50 MW
Capacity
1
Components
Battery
6y 2m
In Queue
System Impact Study
IA Phase
COD target: 2023
Total Duration
3y 7m
Schedule
31 months past proposed COD
Study Phase
TC1
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-31
PJM-AF2-376 is a proposed 50 MW battery storage project located in Paulding County, Ohio. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 31, 2020. The proposed commercial operation date is October 31, 2023. The project's interconnection status is currently in the System Impact Study phase. The interconnecting utility is AEP, and the point of interconnection is the Timber Switch 138 kV.
The development project consists solely of battery storage, with a total capacity of 50 MW.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Paulding
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
Paulding Wind Farm II LLC
Utility
AEP
Entity
PJM
Service Type
NRIS
Point of Interconnection
Timber Switch 138 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Paulding Storage IIForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.