Briefing on Paulding Storage II

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Battery
Technology
PJM
Market / region
2023-10-31
Proposed COD
TC1
Queue phase
Briefing/projectactive

Paulding Storage II is a 50 MW Battery project in Ohio, currently active.

EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-10-31.

Queue ID
PJM-AF2-376
Location
Paulding, Ohio
Technology
Battery
Developer
EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
Market / region
PJM
Point of interconnection
Timber Switch 138 kV

What stands out

1

Paulding Storage II is a 50 MW Battery project in Ohio with status active.

2

EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship is the reported developer.

3

The reported queue phase is TC1; proposed COD is 2023-10-31.

Market and operating context

Queue date
2020-03-31
Proposed COD
2023-10-31
IA status
System Impact Study
Study phase
TC1
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Paulding Storage II — verified asset snapshot

FieldValue
Queue IDPJM-AF2-376
LocationPaulding, Ohio
TechnologyBattery
DeveloperEDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
Market / regionPJM
Point of interconnectionTimber Switch 138 kV
Queue date2020-03-31
Proposed COD2023-10-31