Paulding Storage II is a 50 MW Battery project in Ohio, currently active.
EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship is the reported developer. The reported queue phase is TC1. Proposed COD is 2023-10-31.
- Queue ID
- PJM-AF2-376
- Location
- Paulding, Ohio
- Technology
- Battery
- Developer
- EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship
- Market / region
- PJM
- Point of interconnection
- Timber Switch 138 kV
What stands out
1
Paulding Storage II is a 50 MW Battery project in Ohio with status active.
2
EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2023-10-31.
Market and operating context
- Queue date
- 2020-03-31
- Proposed COD
- 2023-10-31
- IA status
- System Impact Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.