Jarratt Energy Facility 2 (PJM-AF2-299) — Project Summary

Queue ID
PJM-AF2-299
Capacity
18 MW
Technology
Solar
Status
withdrawn
Location
Greensville, VA
Region
PJM
Developer
Jarratt Energy Facility, LLC
IA Status
System Impact Study

Jarratt Energy Facility 2

PJM-AF2-299BetaWithdrawnSolarPJMLBNL + Live

18 MW generation in Greensville, VA · In queue since March 2020 · Proposed COD January 2029

Withdrawn from the PJM queue in June 2026, according to PJM's cycle queue (Oct 2026).

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

18 MW

Capacity

1

Components

Solar

6y 8m

In Queue

System Impact Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 10m

Study Phase

TC1

Queue EntryMar 30, 2020

Interconnection request submitted to ISO/RTO

Commercial Operation

Proposed COD: 2029-01-31

WithdrawnWithdrawn

Project withdrew from interconnection queue

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Jarratt Energy Facility 2 is a proposed 18 MW solar generation project located in Greensville County, Virginia. The project is in the PJM interconnection queue as entry PJM-AF2-299, with a queue entry date of March 30, 2020. Dominion is the interconnecting utility.

The proposed commercial operation date for the Jarratt Energy Facility 2 is December 12, 2022. The project's interconnection status is currently in the System Impact Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

Greensville

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Jarratt Energy Facility, LLC

Utility

Dominion

Entity

PJM

Service Type

NRIS

Point of Interconnection

Fields 34.5 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.