Briefing/projectactive
Jarratt Energy Facility 2 is a 18 MW Solar project in Virginia, currently active.
Jarratt Energy Facility, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2022-12-12.
- Queue ID
- PJM-AF2-299
- Location
- Greensville, Virginia
- Technology
- Solar
- Developer
- Jarratt Energy Facility, LLC
- Market / region
- PJM
- Point of interconnection
- Fields 34.5 kV
What stands out
1
Jarratt Energy Facility 2 is a 18 MW Solar project in Virginia with status active.
2
Jarratt Energy Facility, LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2022-12-12.
Market and operating context
- Queue date
- 2020-03-30
- Proposed COD
- 2022-12-12
- IA status
- System Impact Study
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.