Maple Hill-Fiddlers 1 SP (Bear Rock)
50 MW generation in Cambria, PA · In queue since December 2019 · Proposed COD September 2021
50 MW
Capacity
1
Components
Solar
6y 5m
In Queue
System Impact Study
IA Phase
COD target: 2021
Total Duration
1y 9m
Schedule
58 months past proposed COD
Study Phase
TC1
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-09-01
PJM-AF2-050 is a proposed solar generation project with a total capacity of 50 MW, located in Cambria County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, having entered the queue on December 23, 2019. The proposed commercial operation date is September 1, 2021. The interconnecting utility is PENELEC. The project's interconnection status is currently in the System Impact Study phase.
The development project consists of 50 MW of solar photovoltaic generation. The point of interconnection is the Bearrock-Johnstown 230 kV line.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Cambria
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
CPV Maple Hill Solar, LLC
Utility
PENELEC
Entity
PJM
Service Type
NRIS
Point of Interconnection
Bear Rock-Johnstown 230 kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.