Chesterfield CT Units 3&4
569 MW generation in Chesterfield, VA · In queue since September 2019 · Proposed COD December 2029
569 MW
Capacity
1
Components
Gas
7y 2m
In Queue
IA Executed
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Under Construction
Project under construction
Typical: 24–48 months
Proposed COD: 2029-12-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/pjm-af1-129
- virginiabusiness.com/dominion-gas-plant-in-chesterfield-on-hold-while-scc-considers-petition/
- powermag.com/dominion-seeks-virginia-approval-for-1-gw-gas-fired-power-plant/
Commercial operation date: The only COD signal is the LBNL/PJM proposed completion date of 2029-12-31. Aggregator pages (interconnection.fyi, Cleanview) repeat it and add nothing independent. No developer press release or news article gives a financing-backed date for AF1-129.
Developer: LBNL lists no developer, and no search result names an owner for AF1-129. Dominion Energy's proposed Chesterfield gas plant (CERC, about 1 GW) is at the same site, but no source ties it to this 569 MW queue entry, so I did not assign Dominion.
Status: LBNL and interconnection.fyi both show the project as active in the queue. The Dec 2025 hold on the Dominion Chesterfield plant may be relevant, but it is not confirmed to be the same project and does not change the queue status.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Chesterfield CT Units 3&4 project is a proposed 569 MW gas-fired generation project located in Chesterfield County, Virginia. The project, developed by Dominion, is interconnected within the PJM Interconnection queue under queue ID PJM-AF1-129. It entered the queue on September 18, 2019, with a proposed commercial operation date of December 31, 2029, and has an executed Interconnection Agreement (IA).
This development is linked to the existing Chesterfield operating plant (EIA plant ID 3797). The point of interconnection is the Chesterfield 230 kV substation. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
NRIS
Point of Interconnection
Chesterfield 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CHESTER414 KV G3
- POI Substation
- Chesterfield Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.