Chesterfield CT Units 3&4

PJM-AF1-129BetaActiveGasPJMLBNL + Live

569 MW generation in Chesterfield, VA · In queue since September 2019 · Proposed COD December 2029

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

569 MW

Capacity

1

Components

Gas

7y 2m

In Queue

IA Executed

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 3m

Construction75%
Queue EntrySep 18, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Under Construction

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2029-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the PJM queue with an IA reported as executed (no IA date). The related Dominion Chesterfield gas plant was reported on hold in Dec 2025 while the SCC reconsiders its approval, but the link to this queue entry is unconfirmed.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/pjm-af1-129
  2. virginiabusiness.com/dominion-gas-plant-in-chesterfield-on-hold-while-scc-considers-petition/
  3. powermag.com/dominion-seeks-virginia-approval-for-1-gw-gas-fired-power-plant/

Commercial operation date: The only COD signal is the LBNL/PJM proposed completion date of 2029-12-31. Aggregator pages (interconnection.fyi, Cleanview) repeat it and add nothing independent. No developer press release or news article gives a financing-backed date for AF1-129.

Developer: LBNL lists no developer, and no search result names an owner for AF1-129. Dominion Energy's proposed Chesterfield gas plant (CERC, about 1 GW) is at the same site, but no source ties it to this 569 MW queue entry, so I did not assign Dominion.

Status: LBNL and interconnection.fyi both show the project as active in the queue. The Dec 2025 hold on the Dominion Chesterfield plant may be relevant, but it is not confirmed to be the same project and does not change the queue status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Chesterfield CT Units 3&4 project is a proposed 569 MW gas-fired generation project located in Chesterfield County, Virginia. The project, developed by Dominion, is interconnected within the PJM Interconnection queue under queue ID PJM-AF1-129. It entered the queue on September 18, 2019, with a proposed commercial operation date of December 31, 2029, and has an executed Interconnection Agreement (IA).

This development is linked to the existing Chesterfield operating plant (EIA plant ID 3797). The point of interconnection is the Chesterfield 230 kV substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

VA

County

Chesterfield

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

Dominion

Entity

PJM

Service Type

NRIS

Point of Interconnection

Chesterfield 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CHESTER414 KV G3
POI Substation
Chesterfield Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.