Briefing on Chesterfield

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
447 MW
Capacity
Operating
Current status
1990
Operating since
4
Generators
53.0%
Capacity factor
2070 GWh
Annual generation
Briefing/plantOperating

Chesterfield is a 447 MW Natural Gas Fired Combined Cycle asset in PJM Interconnection, currently Operating.

Chesterfield is reported in Virginia since 1990 under Dominion Energy. Available operating and financial measures include 53.0% capacity factor and 2070 GWh annual generation; $1017/kW reported CapEx.

Location
Chesterfield, Virginia
Technology
Natural Gas Fired Combined Cycle
Owner / parent
Dominion Energy
Operator
Virginia Electric & Power Co
Grid
PJM Interconnection
Plant ID
3797

What stands out

1

Chesterfield is a 447 MW Natural Gas Fired Combined Cycle asset in Virginia with status Operating.

2

Latest annual operating measures report 53.0% capacity factor and 2070 GWh annual generation.

3

Available financial measures include $11.9/MWh OpEx, $1017/kW CapEx.

4

1 linked queue projects represent 569 MW of proposed capacity.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
SERC
State rank
#14 of 30
National rank
#541 of 2,025

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.