CVOW 3, OSS 3 ‚Äì T3G15 (PJM-AF1-125) — Project Summary

Queue ID
PJM-AF1-125
Capacity
820 MW
Technology
Offshore Wind
Status
active
Location
City Of Chesapeake, VA
Region
PJM
Developer
Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
IA Status
IA Pending

CVOW 3, OSS 3 – T3G15

PJM-AF1-125BetaActiveOffshore WindPJMLBNL + Live

820 MW generation in City Of Chesapeake, VA · In queue since September 2019 · Proposed COD December 2032

BA: PJMISO/RTO: PJMNERC: SERCRC: PJM

820 MW

Capacity

1

Components

Offshore Wind

7y 2m

In Queue

IA Pending

IA Phase

COD target: 2032

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

13y 3m

Study Phase

TC1

In Study38%
Queue EntrySep 17, 2019

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

UC-ISP; FINAL AGREEMENT; TC1

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2032-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2032
From queue filing
Developer in saved assessment
Dominion Energy Virginia (Virginia Electric and Power Company)
Sources agreed at research time
Status at research time
Active
Active in PJM queue (IA Pending, Harper 230 kV POI). The queue entry appears to be part of Dominion's CVOW offshore wind program, which is under construction. A Dec 2025 BOEM suspension order was found likely unlawful by a federal court, but a direct link between this specific queue position and the construction phase is not confirmed.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. app.nrgmap.com/queues/lbnl-pjm-af1-125
  2. infrasure.ai/project/pjm-af1-125-cvow-3-oss-3-t3g15
  3. cleanview.co/power-projects/planned/wind-farms/virginia/AF1-125%20-%20moved%20to%20TC1/cvow-3-oss-3--t3g15
  4. pilotonline.com/2026/09/06/dominions-offshore-turbines-multiply-despite-trumps-war-on-wind/
  5. coastalvawind.com/resources/docs/20260901_september_mariner_update.pdf
  6. courthousenews.com/wp-content/uploads/2026/01/virginia-electric-and-power-company-v-united-states-department-of-the-interior.pdf

Commercial operation date: Only the LBNL-derived data (NRG Map: 'Proposed online 2032-12-31', Cleanview: 'Expected online 2032') gives a date for this queue position. Infrasure lists 2024-12-31, but that conflicts with the LBNL value and looks like an aggregator error. No developer or press source gives a COD for this specific position. The 2.6 GW CVOW construction coverage does not state one.

Developer: The LBNL filer is the Dominion utility itself, and the federal court filings name 'Virginia Electric and Power Company, d/b/a Dominion Energy Virginia' with OSW Project LLC as plaintiffs. That is consistent with the LBNL filer, so there is no shell-LLC discrepancy for this queue entry.

Status: LBNL shows 'active' as of 31 Dec 2025 with IA Pending and no IA date. Recent coverage (Sep 2026) says CVOW construction is continuing despite federal opposition. Nothing indicates withdrawal or suspension of this queue position.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PJM-AF1-125 is a proposed 820 MW offshore wind generation project located in the City Of Chesapeake, Virginia. The project, developed by Dominion, entered the PJM interconnection queue on September 17, 2019, with a proposed commercial operation date of December 31, 2024. Its interconnection status is currently in the System Impact Study phase.

The proposed project consists of 820 MW of offshore wind capacity. The point of interconnection is at Oceana 230 kV. The project is currently listed as active in the PJM queue and has appeared in recent news coverage regarding offshore wind development in the region.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM_CYCLE queue source as of: Oct 23, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

VA

County

City Of Chesapeake

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)

Utility

Dominion

Entity

PJM

Service Type

NRIS

Point of Interconnection

Harper 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HARPER 138 KV MOBILE
POI Substation
Harper Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.