Madison Solar 1
100 MW generation in Madison, KY · In queue since March 2019 · Proposed COD January 2029
100 MW
Capacity
1
Components
Solar
7y 8m
In Queue
IA Pending
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 10m
Study Phase
TC1
Interconnection request submitted to ISO/RTO
EP; FINAL AGREEMENT; TC1
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-31
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 23, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Entered PJM interconnection queue as AE2-308
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of May 2021. No news or research findings to validate or contradict this date, which is now 3+ years past, suggesting project may be stalled or withdrawn despite 'active' status.
Developer: Only LBNL filing entity available. No research findings to identify parent company or operating entity behind the LLC. Unable to determine if this is a shell entity or the actual developer.
Status: LBNL shows 'active' status with IA Pending, but the 2021 proposed COD has long passed with no news coverage, financing announcements, or construction updates found, suggesting the project may be dormant.
About
Generated Apr 10, 2026 · Predates Oct 23, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Madison Solar 1 is a proposed 100 MW solar generation project located in Madison County, Kentucky. The project is being developed within the PJM Interconnection queue as queue ID PJM-AE2-308. Its queue entry date is March 29, 2019, with a proposed commercial operation date of May 31, 2021. The interconnection status is currently in the System Impact Study phase.
The project is interconnected to the Three Forks-Dale 138 kV point of interconnection and has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM_CYCLE queue source as of: Oct 23, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KY
County
Madison
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
AEUG Madison Solar, LLC
Utility
EKPC
Entity
PJM
Service Type
NRIS
Point of Interconnection
Three Forks-Dale 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesAEUG Madison Solar, LLC
Data-driven briefing on AEUG Madison Solar, LLC — fleet, generation, financial, and news signals.
Madison Solar 1
Data-driven briefing on Madison Solar 1 — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.