Briefing/projectactive
Madison Solar 1 is a 100 MW Solar project in Kentucky, currently active.
AEUG Madison Solar, LLC is the reported developer. The reported queue phase is TC1. Proposed COD is 2021-05-31.
- Queue ID
- PJM-AE2-308
- Location
- Madison, Kentucky
- Technology
- Solar
- Developer
- AEUG Madison Solar, LLC
- Market / region
- PJM
- Point of interconnection
- Three Forks-Dale 138 kV
What stands out
1
Madison Solar 1 is a 100 MW Solar project in Kentucky with status active.
2
AEUG Madison Solar, LLC is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2021-05-31.
4
Latest linked story: “EDF Renewables and Enbridge announce commercial operation of solar project” (BIC Magazine, 2025-01-08).
Market and operating context
- Queue date
- 2019-03-29
- Proposed COD
- 2021-05-31
- IA status
- IA Pending
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.