Yellow Wood Solar Energy Center (PJM-AE2-221) — Project Summary

Queue ID
PJM-AE2-221
Capacity
300 MW
Technology
Solar
Status
active
Location
Clinton, OH
Region
PJM
Developer
—
IA Status
IA Executed

Yellow Wood Solar Energy Center

PJM-AE2-221BetaActiveSolarPJMLBNL + Live

300 MW generation in Clinton, OH · In queue since March 2019 · Proposed COD December 2027

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

300 MW

Capacity

1

Components

Solar

7y 8m

In Queue

IA Executed

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 9m

Construction75%
Queue EntryMar 21, 2019

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Under Construction

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — IA Executed, but faced local government opposition as of 2022; no recent construction or permitting updates found
Financing
Not recorded

Milestones in this assessment

IA executed

Interconnection Agreement executed per LBNL queue status

Permit approvedMay 2022Latest in this assessment

Clinton County commissioners formally objected to the proposed 300 MW solar project

wnewsj.com
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. wnewsj.com/2022/05/25/clinton-county-commissioners-lay-out-objections-to-proposed-solar-power-generation-project/

Commercial operation date: Only LBNL provides a COD target of 2027-12-31. No recent news or press releases confirm or update this timeline. The 2022 news article indicates local opposition but no revised COD.

Developer: LBNL snapshot contains no developer information. News articles and search results did not surface the project developer or operating company name.

Status: LBNL shows 'active' with IA Executed. 2022 news indicates Clinton County commissioners objected to the project, suggesting permitting challenges, but no withdrawal or cancellation announced.

Project lifecycle
as of 2022-05-25
OperationalNoWilmington News Journal · 2022-05-25
TechnologySolarWilmington News Journal · 2022-05-25
Permit decisionContestedWilmington News Journal · 2022-05-25

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Yellow Wood Solar Energy Center is a proposed 300 MW solar generation project located in Clinton County, Ohio. The project is in the PJM interconnection queue as entry PJM-AE2-221, with a queue entry date of March 21, 2019, and a proposed commercial operation date of December 31, 2027. The interconnection agreement has been executed.

The proposed project has been the subject of recent news coverage, including reports on deals and industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

OH

County

Clinton

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

Dayton

Entity

PJM

Service Type

NRIS

Point of Interconnection

Clinton-Stuart 345 kV

Data Source

LBNL + Live

DeveloperInvenergyData Centre Magazine · 2025-06-26
TransactionPPAData Centre Magazine · 2025-06-26
OfftakerMetaData Centre Magazine · 2025-06-26
PPA structurePhysicalData Centre Magazine · 2025-06-26
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.