Briefing on Yellow Wood Solar Energy Center

Entity Briefing
Generated Oct 8, 2026·Dataset freshness not reported
300 MW
Proposed capacity
active
Current status
Solar
Technology
PJM
Market / region
2027-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Yellow Wood Solar Energy Center is a 300 MW Solar project in Ohio, currently active.

The reported queue phase is IA Executed. Proposed COD is 2027-12-31.

Queue ID
PJM-AE2-221
Location
Clinton, Ohio
Technology
Solar
Market / region
PJM
Point of interconnection
Clinton-Stuart 345 kV

What stands out

1

Yellow Wood Solar Energy Center is a 300 MW Solar project in Ohio with status active.

2

The reported queue phase is IA Executed; proposed COD is 2027-12-31.

3

Latest linked story: “Meta Forms Solar & Wind Deals to Meet AI Data Centre Demand” (Data Centre Magazine, 2025-06-26).

Market and operating context

Queue date
2019-03-21
Proposed COD
2027-12-31
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Yellow Wood Solar Energy Center — verified asset snapshot

FieldValue
Queue IDPJM-AE2-221
LocationClinton, Ohio
TechnologySolar
Market / regionPJM
Point of interconnectionClinton-Stuart 345 kV
Queue date2019-03-21
Proposed COD2027-12-31
IA statusIA Executed