Grover Hill Wind Project
140.3 MW generation in Paulding, OH · In queue since September 2018 · Proposed COD February 2026
140.3 MW
Capacity
1
Components
Wind
8y 2m
In Queue
IA Executed
IA Phase
COD target: 2026
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 5m
Schedule
10 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Partially in Service - Under Construction
Project under construction
Typical: 18–36 months
Proposed COD: 2026-02-05
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Ohio Power Siting Board authorized construction of wind farm
toledoblade.comOhio Power Siting Board approved transmission line for project
toledoblade.comResearch sources and reasoning (2 recorded sources)
medium confidence at research time
- toledoblade.com/local/environment/2022/12/23/state-board-authorizes-construction-wind-farm-paulding-county/stories/20221223008
- toledoblade.com/local/environment/2023/03/17/board-approves-transmission-line-future-grover-hill-wind-farm-paulding-county/stories/20230317122
Commercial operation date: LBNL queue shows 2026-02-05 COD. News from 2022-2023 confirms construction authorization but provides no updated COD target. No contradicting evidence found.
Developer: News sources consistently identify 'Grover Hill Wind, LLC' as both applicant and developer. No parent company or operating entity identified in available sources. Appears to be project-specific entity rather than shell LLC for larger developer.
Status: LBNL shows 'Active' with IA Executed. Ohio Power Siting Board approved construction in December 2022 and transmission line in March 2023, confirming project advancement toward construction phase.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Grover Hill Wind Project is a proposed 140.3 MW wind generation project located in Paulding County, Ohio. The project, developed under the utility AEP, is interconnected within the PJM Interconnection queue as project number PJM-AE1-245, with an interconnection queue entry date of September 18, 2018. The proposed commercial operation date is February 5, 2026, and the Interconnection Agreement (IA) has been executed.
The project is linked to the existing Grover Hill Wind, LLC operating plant (EIA ID 66359). The Grover Hill Wind Project has been the subject of recent news coverage, primarily related to regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
OH
County
Paulding
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
NRIS
Point of Interconnection
Haviland 138 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HAVILAND34.5 KV GROVERWF
- POI Substation
- Latty co-op Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26