Sullivan Generating Station 2 (PJM-AB1-088) — Project Summary

Queue ID
PJM-AB1-088
Capacity
575 MW
Technology
Gas
Status
active
Location
Sullivan, IN
Region
PJM
Developer
—
IA Status
IA Executed

Sullivan Generating Station 2

PJM-AB1-088BetaActiveGasPJMLBNL + Live

575 MW generation in Sullivan, IN · In queue since October 2015 · Proposed COD December 2028

BA: MISOISO/RTO: PJMNERC: RFCRC: MISO

575 MW

Capacity

1

Components

Gas

11y 1m

In Queue

IA Executed

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

13y 2m

Construction75%
Queue EntryOct 1, 2015

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Engineering and Procurement

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2028-12-31

News-reported activity
as of 2y 2m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusApprovedMagnolia Tribune · 2024-09-03

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the PJM AB1 queue. LBNL lists the IA as executed, with no date. No public signal of permitting, construction start or financing was found.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/natural-gas-power-plants/indiana/AB1-088/sullivan-generating-station-2
  2. infrasure.ai/project/pjm-ab1-088-sullivan-generating-station-2

Commercial operation date: The only COD in the sources is LBNL's 2028-12-31. Cleanview says 'Expected online 2028', but it uses the same queue ID (AB1-088) and is probably derived from the queue data, so I don't count it as independent. No press release or news confirms or contradicts the date.

Developer: The LBNL developer field is null, and no search result names a developer or operating company for Sullivan Generating Station 2. The AEP/X-energy/Amazon nuclear study in Sullivan County and Hallador's Merom station are separate projects, and nothing links them to this gas queue entry.

Status: LBNL lists the status as active and the IA as executed, and nothing in the search results contradicts that. The news-extracted facts (Greenville Natural Gas Power Station, Entergy Mississippi) describe a different project in another state and were discarded.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sullivan Generating Station 2 project is a proposed 575 MW gas-fired generation facility in Sullivan County, Indiana. The project, located within the PJM Interconnection region, is being developed by AEP. It entered the PJM interconnection queue as project number PJM-AB1-088 on October 1, 2015, and has a proposed commercial operation date of December 31, 2028. The project's interconnection agreement has been executed.

The Sullivan Generating Station 2 development has been the subject of recent news coverage, with 22 articles appearing in the press. These articles cover topics such as industry trends, deals, grid infrastructure, regulatory matters, and project development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

IN

County

Sullivan

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

AEP

Entity

PJM

Service Type

NRIS

Point of Interconnection

Sullivan 345kV #2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SULLIVAN69 KV T1
POI Substation
Sullivan Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26