Glen Falls Facility (PJM-AA2-119) — Project Summary

Queue ID
PJM-AA2-119
Capacity
550 MW
Technology
Gas
Status
active
Location
Harrison, WV
Region
PJM
Developer
—
IA Status
IA Executed

Glen Falls Facility

PJM-AA2-119BetaActiveGasPJMLBNL + Live

550 MW generation in Harrison, WV · In queue since April 2015 · Proposed COD January 2029

BA: PJMISO/RTO: PJMNERC: RFCRC: PJM

550 MW

Capacity

1

Components

Gas

11y 7m

In Queue

IA Executed

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

13y 9m

Construction75%
Queue EntryApr 30, 2015

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Under Construction

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2029-01-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 31, 2029
From queue filing
Developer in saved assessment
—
Status at research time
IA Executed
Active in the PJM queue with an executed interconnection agreement (IA date not given). No evidence of construction start, financing, or permitting was found.
Financing
Not recorded

Milestones in this assessment

COD targetJan 31, 2029Latest in this assessment

PJM queue proposed COD of 2029-01-31 (mirrors the LBNL/PJM filing, not a developer announcement).

infrasure.ai
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. infrasure.ai/project/pjm-aa2-119-glen-falls-facility
  2. interconnection.fyi/project/pjm-aa2-119
  3. amcompute.com/data-center-site-finder/west-virginia
  4. savrn.com/data-center-permits-tracker/west-virginia
  5. cleanview.co/power-projects/planned/natural-gas-power-plants/west-virginia/AA2-119/glen-falls-facility

Commercial operation date: The only COD evidence is the PJM queue date of 2029-01-31. Aggregators (interconnection.fyi, infrasure, Cleanview) repeat it as 'Proposed COD: 2029-01-31' and are not independent developer sources. The amcompute listing shows 'in service 2028-03', but it is an unattributed aggregator figure and does not meet the two-signal bar for overriding LBNL.

Developer: LBNL lists no developer, and none of the search results name a sponsor or operating company for AA2-119. The ESC Harrison County 610 MW plant is in the same county but cannot be tied to this queue position, so I did not link them.

Status: LBNL and aggregators (infrasure, amcompute 'Agreement signed') agree on an active queue position with an executed IA. The savrn 'Under construction' label is unverified, mixes several Glen Falls queue entries (580 MW, 625 MW), and is not corroborated by any news or developer source.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Glen Falls Facility is a proposed 550 MW natural gas generation project located in Harrison County, West Virginia. The development project, under the queue ID PJM-AA2-119, is interconnected within the PJM Interconnection queue. The project was entered into the queue on April 30, 2015, with a proposed commercial operation date of January 31, 2029. The interconnection agreement (IA) for the project has been executed.

The project is linked to the existing Glen Falls 138kV point of interconnection. Recent news coverage has discussed the project in relation to industry and regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • PJM queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

WV

County

Harrison

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

—

Utility

APS

Entity

PJM

Service Type

NRIS

Point of Interconnection

Glen Falls 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.