Glen Falls Facility
550 MW generation in Harrison, WV · In queue since April 2015 · Proposed COD January 2029
550 MW
Capacity
1
Components
Gas
11y 7m
In Queue
IA Executed
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
13y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Under Construction
Project under construction
Typical: 24–48 months
Proposed COD: 2029-01-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
PJM queue proposed COD of 2029-01-31 (mirrors the LBNL/PJM filing, not a developer announcement).
infrasure.aiResearch sources and reasoning (5 recorded sources)
low confidence at research time
- infrasure.ai/project/pjm-aa2-119-glen-falls-facility
- interconnection.fyi/project/pjm-aa2-119
- amcompute.com/data-center-site-finder/west-virginia
- savrn.com/data-center-permits-tracker/west-virginia
- cleanview.co/power-projects/planned/natural-gas-power-plants/west-virginia/AA2-119/glen-falls-facility
Commercial operation date: The only COD evidence is the PJM queue date of 2029-01-31. Aggregators (interconnection.fyi, infrasure, Cleanview) repeat it as 'Proposed COD: 2029-01-31' and are not independent developer sources. The amcompute listing shows 'in service 2028-03', but it is an unattributed aggregator figure and does not meet the two-signal bar for overriding LBNL.
Developer: LBNL lists no developer, and none of the search results name a sponsor or operating company for AA2-119. The ESC Harrison County 610 MW plant is in the same county but cannot be tied to this queue position, so I did not link them.
Status: LBNL and aggregators (infrasure, amcompute 'Agreement signed') agree on an active queue position with an executed IA. The savrn 'Under construction' label is unverified, mixes several Glen Falls queue entries (580 MW, 625 MW), and is not corroborated by any news or developer source.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Glen Falls Facility is a proposed 550 MW natural gas generation project located in Harrison County, West Virginia. The development project, under the queue ID PJM-AA2-119, is interconnected within the PJM Interconnection queue. The project was entered into the queue on April 30, 2015, with a proposed commercial operation date of January 31, 2029. The interconnection agreement (IA) for the project has been executed.
The project is linked to the existing Glen Falls 138kV point of interconnection. Recent news coverage has discussed the project in relation to industry and regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- PJM queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WV
County
Harrison
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
NRIS
Point of Interconnection
Glen Falls 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Little Falls (WA)
Data-driven briefing on Glen Falls Facility — fleet, generation, financial, and news signals.
NASA Wallops Flight Facility Solar
Data-driven briefing on Glen Falls Facility — fleet, generation, financial, and news signals.
Glen
Data-driven briefing on Glen — fleet, generation, financial, and news signals.
Jarratt Energy Facility 2 queue pipeline — 1 projects by technology and status
Data-driven briefing on Glen Falls Facility — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.