Bull Creek (Osceola Generating Station) (OUC-202110) — Project Summary

Queue ID
OUC-202110
Capacity
555 MW
Technology
Gas
Status
active
Location
Osceola, FL
Region
Southeast
Developer
—
IA Status
IA Executed

Bull Creek (Osceola Generating Station)

OUC-202110BetaActiveGasOUCLBNL

555 MW generation in Osceola, FL · In queue since September 2021 · Proposed COD June 2025

BA: FPLNERC: FRCCRC: FRCC

555 MW

Capacity

1

Components

Gas

5y 2m

In Queue

IA Executed

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Schedule

18 months past proposed COD

Construction75%
Queue EntrySep 28, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2025-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2025
From queue filing
Developer in saved assessment
Orlando Utilities Commission (OUC)
Ownership change in saved research
Status at research time
Active
Active in the queue with IA executed. The underlying 510 MW idle peaker plant was bought by OUC in 2021 for upgrade, and no construction or restart milestone has been reported.
Financing
Not recorded
Ownership history
  1. 2021-09·Genova (Texas-based private ownership group)→Orlando Utilities Commission (OUC)flpublicpower.com

Milestones in this assessment

Ownership changeSep 28, 2021Latest in this assessment

OUC completed its roughly $100M purchase of the 510 MW Osceola Generating Station from Genova.

flpublicpower.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. flpublicpower.com/news/ouc-completes-purchase-of-osceola-natural-gas-power-plant-
  2. cfpublic.org/2021-08-11/ouc-moves-to-purchase-osceola-power-plant
  3. energyonline.com/Industry/News.aspx?NewsID=36149&OUC_Acquires_Osceola_Natural_Gas_Power_Plant_
  4. infrasure.ai/project/ouc-202110-bull-creek-osceola-generating-station
  5. interconnection.fyi/project/orlando-utilities-commission-202110
  6. interxdata.com/projects/bull-creek-osceola-generating-station-ouc-202110/

Commercial operation date: No post-LBNL source gives a different COD. The interconnection.fyi listing only repeats the LBNL date (May 31, 2025), and the 2021 news says only that the plant could be 'operational in a few years'. The date has likely passed with no confirmation of operation, so it may be stale.

Developer: LBNL leaves the developer blank, but the queue ID prefix is OUC and Infrasure names OUC as developer. OUC completed its purchase of the Osceola Generating Station from Genova, a Texas-based private owner, on Sept 28, 2021, which is also the LBNL queue date.

Status: LBNL lists the project as active with an executed IA, and interconnection.fyi and interxdata (Aug 2026) still show it active. No source reports withdrawal, construction start, or completion of the upgrade.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Bull Creek (Osceola Generating Station) project is a proposed 555 MW gas-fired generation project located in Osceola County, Florida. The developer is Orlando Utilities Commission (OUC). This project is listed in the queue as OUC-202110, with a queue entry date of September 28, 2021, and a proposed commercial operation date of June 1, 2025. The interconnection agreement for this project has been executed.

The project is interconnected to the grid at the Rocky Pond point of interconnection. Recent news coverage has discussed the development of this project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

FL

County

Osceola

Grid Region

Southeast

Market

—

Developer

—

Utility

Orlando Utilities Commission

Entity

OUC

Service Type

NRIS

Point of Interconnection

Rocky Pond

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.