Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2
615 MW hybrid in — · In queue since June 2024 · Proposed COD March 2028
615 MW
Capacity
1
Components
Other
2y 5m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 9m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- interconnection.fyi/project/miso-r1052
- infrasure.ai/project/miso-r1052-replacing-615-mw-coal-with-615-mw-bess-campbell-units-1-2
Commercial operation date: Only queue-derived data exists. Interconnection.fyi and Infrasure both repeat the LBNL/MISO proposed COD of March 31, 2028, and these are not independent post-LBNL signals. No press release or news gives a different date.
Developer: The LBNL developer field is null. Infrasure says the project is 'sponsored by METC', but this comes from an aggregator and not a press release. The project name refers to Campbell Units 1 & 2, which are Consumers Energy's coal units, so the sponsor attribution is weakly supported and unverified.
Status: LBNL, interconnection.fyi and Infrasure all list the project as active. No source indicates withdrawal, suspension, or an executed IA.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 project is a 615 MW battery storage development in the MISO interconnection queue (queue ID MISO-R1052). The project, located within the MISO region, is sponsored by METC. It entered the queue on June 24, 2024, with a proposed commercial operation date of March 31, 2028.
This hybrid project consists of 615 MW of battery storage capacity. It is listed as active in the interconnection queue. Recent news coverage has discussed the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- MISO queue source as of: Oct 25, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
ERIS
Point of Interconnection
"18CAMPBELLW”, “18CAMPBELLB
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.