Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 (MISO-R1052) — Project Summary

Queue ID
MISO-R1052
Capacity
615 MW
Technology
Battery
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2

MISO-R1052BetaActiveOtherBatteryMISOLBNL + Live

615 MW hybrid in — · In queue since June 2024 · Proposed COD March 2028

ISO/RTO: MISO

615 MW

Capacity

1

Components

Other

2y 5m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryJun 24, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 31, 2028
From queue filing
Developer in saved assessment
METC
From queue filing
Status at research time
Active
Active in the MISO queue since 2024-06-24. No IA executed. No construction or financing news found for the coal-to-BESS replacement at Campbell.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/miso-r1052
  2. infrasure.ai/project/miso-r1052-replacing-615-mw-coal-with-615-mw-bess-campbell-units-1-2

Commercial operation date: Only queue-derived data exists. Interconnection.fyi and Infrasure both repeat the LBNL/MISO proposed COD of March 31, 2028, and these are not independent post-LBNL signals. No press release or news gives a different date.

Developer: The LBNL developer field is null. Infrasure says the project is 'sponsored by METC', but this comes from an aggregator and not a press release. The project name refers to Campbell Units 1 & 2, which are Consumers Energy's coal units, so the sponsor attribution is weakly supported and unverified.

Status: LBNL, interconnection.fyi and Infrasure all list the project as active. No source indicates withdrawal, suspension, or an executed IA.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Replacing 615 MW Coal with 615 MW BESS; Campbell Units 1 & 2 project is a 615 MW battery storage development in the MISO interconnection queue (queue ID MISO-R1052). The project, located within the MISO region, is sponsored by METC. It entered the queue on June 24, 2024, with a proposed commercial operation date of March 31, 2028.

This hybrid project consists of 615 MW of battery storage capacity. It is listed as active in the interconnection queue. Recent news coverage has discussed the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

ERIS

Point of Interconnection

"18CAMPBELLW”, “18CAMPBELLB

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.