Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem (MISO-R1048) — Project Summary

Queue ID
MISO-R1048
Capacity
1231.73 MW
Technology
Gas
Status
active
Location
Iberville, LA
Region
MISO
Developer
—
IA Status
—

Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem

MISO-R1048BetaActiveGasOtherMISOLBNL + Live

1,231.73 MW hybrid in Iberville, LA · In queue since May 2024 · Proposed COD May 2025

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

1,231.73 MW

Capacity

1

Components

Gas

2y 6m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1 year

Schedule

19 months past proposed COD

Pre-Study0%
Queue EntryMay 13, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-05-13

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 13, 2025
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in MISO queue (queue date 2024-05-13). The project replaces 464.5 MW of steam/gas with 97.8 MW of steam at a Dow site, and there is no public evidence of construction, an executed IA or a COD update.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/miso-r1048
  2. infrasure.ai/project/miso-r1048-replacing-464-5-mw-steam-gas-with-97-8-mw-steam-dow-chem

Commercial operation date: Only the LBNL snapshot gives a COD (proposed 2025-05-13). The interconnection.fyi and infrasure.ai pages repeat the LBNL data ("Proposed COD May 2025") and are not independent. No news or press release gives a different date. The date may already be past with the project still active, so it is probably stale.

Developer: The LBNL developer field is null. The project name references DOW Chem, which suggests a Dow Chemical site in Iberville Parish, LA, but no source names a developer or operating company, so none is asserted.

Status: LBNL lists the project as active, and interconnection.fyi and infrasure.ai agree, though both mirror LBNL data. No contradicting news was found.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-R1048, titled "Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem," is a proposed gas-fired development project in Iberville Parish, Louisiana. The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue with a total capacity of 1,231.73 MW. It is classified as a hybrid project, with technology types listed as gas and other, though its single reported component is 1,231.73 MW of gas generation. As the project title indicates, the request involves replacing 464.5 MW of existing steam/gas capacity with 97.8 MW of steam capacity in connection with Dow Chemical. The interconnecting utility is Entergy Louisiana, and the point of interconnection is the Dow Meter Point.

The project entered the MISO queue on May 13, 2024, and holds an active status. It requested Network Resource Interconnection Service (NRIS) and has a proposed commercial operation date of May 13, 2025. The provided data does not include information on the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Iberville

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY LOUISIANA

Entity

MISO

Service Type

NRIS

Point of Interconnection

Dow Meter Point

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
POI Substation
Martin Creek Meter Point

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.