Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem
1,231.73 MW hybrid in Iberville, LA · In queue since May 2024 · Proposed COD May 2025
1,231.73 MW
Capacity
1
Components
Gas
2y 6m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1 year
Schedule
19 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-05-13
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- interconnection.fyi/project/miso-r1048
- infrasure.ai/project/miso-r1048-replacing-464-5-mw-steam-gas-with-97-8-mw-steam-dow-chem
Commercial operation date: Only the LBNL snapshot gives a COD (proposed 2025-05-13). The interconnection.fyi and infrasure.ai pages repeat the LBNL data ("Proposed COD May 2025") and are not independent. No news or press release gives a different date. The date may already be past with the project still active, so it is probably stale.
Developer: The LBNL developer field is null. The project name references DOW Chem, which suggests a Dow Chemical site in Iberville Parish, LA, but no source names a developer or operating company, so none is asserted.
Status: LBNL lists the project as active, and interconnection.fyi and infrasure.ai agree, though both mirror LBNL data. No contradicting news was found.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
MISO-R1048, titled "Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem," is a proposed gas-fired development project in Iberville Parish, Louisiana. The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue with a total capacity of 1,231.73 MW. It is classified as a hybrid project, with technology types listed as gas and other, though its single reported component is 1,231.73 MW of gas generation. As the project title indicates, the request involves replacing 464.5 MW of existing steam/gas capacity with 97.8 MW of steam capacity in connection with Dow Chemical. The interconnecting utility is Entergy Louisiana, and the point of interconnection is the Dow Meter Point.
The project entered the MISO queue on May 13, 2024, and holds an active status. It requested Network Resource Interconnection Service (NRIS) and has a proposed commercial operation date of May 13, 2025. The provided data does not include information on the status of an interconnection agreement.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- MISO queue source as of: Oct 25, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
LA
County
Iberville
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY LOUISIANA
Entity
MISO
Service Type
NRIS
Point of Interconnection
Dow Meter Point
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- LOUISIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Martin Creek Meter Point
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Louisiana in Louisiana growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Louisiana 1
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem Solar in ISO New England queue pipeline — 1 projects by technology and status
Data-driven briefing on Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.