Malden CCGT
1,089.8 MW generation in Porter, IN · In queue since August 2025 · Proposed COD August 2028
1,089.8 MW
Capacity
1
Components
Gas
1y 3m
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3 years
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/projects/market/MISO
- interconnection.fyi/project/miso-e0035
- interconnection.fyi/projects/state/IN
- infrasure.ai/project/miso-e0035-malden-ccgt
- interxdata.com/projects/malden-ccgt-miso-e0035/
Commercial operation date: Only the LBNL filing gives a COD (2028-08-01), and the Infrasure page repeats it as 'From queue filing'. No press release, news item or developer statement gives an independent target. If the project is withdrawn, as one source suggests, this date is moot.
Developer: LBNL and the aggregator pages all list NIPSCO, and the names come from the queue filing. No independent press release confirms the operating company or shows a shell LLC, acquisition or spin-off.
Status: Two interconnection.fyi pages show Withdrawn and a changed capacity, which points to a newer queue record than the LBNL snapshot. Infrasure and InterX still show Active but label their values as queue-filing data, so they may be stale. No primary MISO or NIPSCO announcement confirms the withdrawal or gives its date.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Malden CCGT is a proposed natural gas-fired generation project in Porter County, Indiana, with a total capacity of 1,089.8 MW. The project is being developed by NIPSCO, which is also the interconnecting utility. As its name indicates, the facility is planned as a combined-cycle gas turbine (CCGT) development. It would interconnect at the Malden 345 kV Substation, a new substation proposed as the project's point of interconnection.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO) under queue ID MISO-E0035. It entered the queue on August 6, 2025, and its status is active. The developer has requested Network Resource Interconnection Service (NRIS). The interconnection agreement status is listed as in progress, though the specific study phase is unknown. The proposed commercial operation date is August 1, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Porter
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
NIPSCO
Utility
NIPSCO
Entity
MISO
Service Type
NRIS
Point of Interconnection
Malden 345kV Substation (new)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.