TOCE GA Solar 4 (GTC-GI-189) — Project Summary

Queue ID
GTC-GI-189
Capacity
325 MW
Technology
Solar+Battery
Status
active
Location
Jefferson, GA
Region
Southeast
Developer
—
IA Status
Facility Study

TOCE GA Solar 4

GTC-GI-189BetaActiveSolarBatteryGTCLBNL

325 MW hybrid in Jefferson, GA · In queue since January 2024 · Proposed COD June 2027

BA: SOCONERC: SERCRC: SOCO

325 MW

Capacity

1

Components

Solar

2y 10m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntryJan 8, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2027
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in GTC queue, Facility Study phase; no IA executed, no construction or financing announcements found
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/georgia-transmission-gi-189
  2. infrasure.ai/project/gtc-gi-189-toce-ga-solar-4
  3. app.nrgmap.com/queues/lbnl-gtc-gi-189
  4. bizapedia.com/ga/toce-ga-solar-4-llc.html

Commercial operation date: Only the LBNL proposed COD of 2027-06-01 exists. Aggregator sites (interconnection.fyi, infrasure.ai) repeat the same queue date and are not independent developer-backed signals, and no press release or news gives a financing-backed target.

Developer: LBNL developer field is null. Corporate registry listings (bizapedia, Georgia company registry) show a project LLC, TOCE GA Solar 4, LLC, in Lawrenceville, GA, but no source names the parent or operating company. The entity is listed as the likely shell but not confirmed as the filer.

Status: LBNL status is active, and NRG Map confirms it as active as of 31 Dec 2025. No news indicates withdrawal, construction, or an executed IA.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

TOCE GA Solar 4 is a proposed 100 MW solar generation project in Jefferson County, Georgia. The project is being developed within the Georgia Transmission (GTC) interconnection queue, identified as GTC-GI-189. The queue entry date is January 8, 2024, with a proposed commercial operation date of June 1, 2027. Its interconnection status is currently in the System Impact Study phase.

The project, which appeared in recent industry news, consists of 100 MW of solar photovoltaic generation. The point of interconnection (POI) is the Wadley _x0013_ Waynesboro TL line tap.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Jefferson

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Wadley – Waynesboro TL line tap

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.