SR Norwood Solar (GTC-GI-173) — Project Summary

Queue ID
GTC-GI-173
Capacity
107 MW
Technology
Solar
Status
active
Location
Warren, GA
Region
Southeast
Developer
IA Status
Construction

SR Norwood Solar

GTC-GI-173BetaActiveSolarGTCLBNL

107 MW generation in Warren, GA · In queue since May 2023 · Proposed COD June 2026

BA: SOCONERC: SERCRC: SOCO

107 MW

Capacity

1

Components

Solar

3y 2m

In Queue

Construction

IA Phase

COD target: 2026

Interconnection

Total Duration

3y 1m

Schedule

0 months past proposed COD

In Study38%
Queue EntryMay 2, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-30

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2026-06-30
From queue filing
Developer
Status
Construction
Construction — LBNL queue status indicates IA executed and construction phase, but no public announcements or ground-truth validation available
Financing
Unannounced
About

The SR Norwood Solar project is a proposed 107 MW solar generation facility located in Warren County, Georgia. The project is interconnected to the Georgia Transmission Corporation (GTC) system and entered the GTC interconnection queue (GTC-GI-173) on May 2, 2023. Its proposed commercial operation date is June 30, 2026, and its interconnection status is currently in the Facility Study phase.

The proposed project is linked to the existing SR Norwood operating plant (EIA plant ID 68563). The project has also appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

GA

County

Warren

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Ray Place Road-Warrenton Primary 115 kV TL

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about SR Norwood Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.