Briefing on SR Norwood Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
107 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2026-06-30
Proposed COD
Construction
Queue phase
Briefing/projectactive

SR Norwood Solar is a 107 MW Solar project in Georgia, currently active.

The reported queue phase is Construction. Proposed COD is 2026-06-30.

Queue ID
GTC-GI-173
Location
Warren, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
Ray Place Road-Warrenton Primary 115 kV TL

What stands out

1

SR Norwood Solar is a 107 MW Solar project in Georgia with status active.

2

The reported queue phase is Construction; proposed COD is 2026-06-30.

Market and operating context

Queue date
2023-05-02
Proposed COD
2026-06-30
IA status
Construction
Study phase
Construction

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SR Norwood Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-173
LocationWarren, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionRay Place Road-Warrenton Primary 115 kV TL
Queue date2023-05-02
Proposed COD2026-06-30
IA statusConstruction