Brenneman Solar
150 MW generation in Macon, GA · In queue since November 2022 · Proposed COD November 2024
150 MW
Capacity
1
Components
Solar
4 years
In Queue
Facility Study
IA Phase
COD target: 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 years
Schedule
24 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-11-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
- 2021-12·Avangrid→Doral Renewablesrenews.biz
Milestones in this assessment
Doral Renewables acquired 150MW Brenneman Solar project from Avangrid
renews.bizResearch sources and reasoning (1 recorded sources)
medium confidence at research time
Commercial operation date: Only LBNL queue snapshot provides a COD target of 2024-11-30. No news or search results provide updated COD information. Given the project is still in Facility Study phase and was acquired in late 2021, this date is likely stale but cannot be corrected with available evidence.
Developer: News extraction confirms acquisition from Avangrid to Doral Renewables in December 2021. LBNL snapshot has null developer field, likely predating the ownership transfer or reflecting a project-LLC filing entity not captured in the data.
Status: LBNL status shows 'active' with IA status at Facility Study stage. No contradicting evidence from news sources; project appears to be progressing through interconnection studies under Doral ownership.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Brenneman Solar project is a proposed 150 MW solar generation facility located in Macon County, Georgia. Interconnection is being managed through the Georgia Transmission (GTC) queue, identified as GTC-GI-169, with an entry date of November 29, 2022. The proposed commercial operation date is November 30, 2024. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Brenneman Solar Project operating plant (EIA ID 66744). Recent news coverage indicates activity related to deals involving the Brenneman Solar project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
GA
County
Macon
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
North Americus – Perry 115 kV TL
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesGeorgia Power at Wadley GA
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Brenneman Solar
Data-driven briefing on Brenneman Solar — fleet, generation, financial, and news signals.
Georgia Power at Swainsboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Jakin GA PV
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.