Briefing/projectactive
Brenneman Solar is a 150 MW Solar project in Georgia, currently active.
The reported queue phase is Facility Study. Proposed COD is 2024-11-30.
- Queue ID
- GTC-GI-169
- Location
- Macon, Georgia
- Technology
- Solar
- Market / region
- Southeast
- Point of interconnection
- North Americus – Perry 115 kV TL
What stands out
1
Brenneman Solar is a 150 MW Solar project in Georgia with status active.
2
The reported queue phase is Facility Study; proposed COD is 2024-11-30.
3
Latest linked story: “Doral acquires Georgia solar project from Avangrid” (pv magazine USA, 2021-12-22).
Market and operating context
- Queue date
- 2022-11-29
- Proposed COD
- 2024-11-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.