Briefing on Brenneman Solar

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2024-11-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Brenneman Solar is a 150 MW Solar project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2024-11-30.

Queue ID
GTC-GI-169
Location
Macon, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
North Americus – Perry 115 kV TL

What stands out

1

Brenneman Solar is a 150 MW Solar project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2024-11-30.

3

Latest linked story: “Doral acquires Georgia solar project from Avangrid” (pv magazine USA, 2021-12-22).

Market and operating context

Queue date
2022-11-29
Proposed COD
2024-11-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Brenneman Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-169
LocationMacon, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionNorth Americus – Perry 115 kV TL
Queue date2022-11-29
Proposed COD2024-11-30
IA statusFacility Study