Meriwether Panther Solar (GTC-GI-161) — Project Summary

Queue ID
GTC-GI-161
Capacity
125 MW
Technology
Solar+Battery
Status
active
Location
Meriwether, GA
Region
Southeast
Developer
IA Status
Facility Study

Meriwether Panther Solar

GTC-GI-161BetaActiveSolarBatteryGTCLBNL

125 MW hybrid in Meriwether, GA · In queue since January 2022 · Proposed COD December 2026

BA: SOCONERC: SERCRC: SOCO

125 MW

Capacity

1

Components

Solar

4y 6m

In Queue

Facility Study

IA Phase

COD target: 2026

Interconnection

Total Duration

4y 11m

Facilities Study50%
Queue EntryJan 28, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2026-12-31
From queue filing
Developer
Status
Active
Active — Facility Study stage per LBNL queue, no public construction or financing announcements found
Financing
Unannounced
Key milestones
IA executedJan 2022Most recent

Entered GTC queue at Facility Study stage

About

The Meriwether Panther Solar project is a proposed 125 MW hybrid solar and battery energy storage project located in Meriwether County, Georgia. The project, which consists of 125 MW of solar generation, is in the Georgia Transmission Corporation (GTC) interconnection queue (GTC-GI-161). The queue entry date is January 28, 2022, and the proposed commercial operation date is December 31, 2026.

The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the GTC 115 kV substation on Rocky Mount Rd. The developer is not specified in the available data, but the project is within the service area of Georgia Transmission Corporation. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Meriwether

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

GTC 115 kV substation on Rocky Mount Rd

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Meriwether Panther Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.