Bear Bin Solar (GTC-GI-125) — Project Summary

Queue ID
GTC-GI-125
Capacity
150 MW
Technology
Solar
Status
active
Location
Terrell, GA
Region
Southeast
Developer
—
IA Status
Facility Study

Bear Bin Solar

GTC-GI-125BetaActiveSolarGTCLBNL

150 MW generation in Terrell, GA · In queue since October 2019 · Proposed COD December 2023

BA: SOCONERC: SERCRC: SOCO

150 MW

Capacity

1

Components

Solar

7y 1m

In Queue

Facility Study

IA Phase

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Schedule

35 months past proposed COD

Facilities Study50%
Queue EntryOct 4, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2023
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — LBNL marks as operational but lacks independent confirmation of commercial operation status
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2023-12-31. LBNL marks project as operational (is_operational=true), suggesting it may have achieved COD, but no independent verification from news or research sources.

Developer: No developer information in LBNL filing and no news or research sources identified the project sponsor or operating company.

Status: LBNL queue status is 'active' with is_operational flag set to true, suggesting the project reached COD. However, absence of press releases, news coverage, or public announcements prevents verification of actual operational status.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bear Bin Solar is a proposed 150 MW solar generation project located in Terrell County, Georgia. The project is being developed within the Georgia Transmission (GTC) interconnection queue as project GTC-GI-125. The queue entry date is October 4, 2019, and the proposed commercial operation date is December 31, 2023.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Walk Ikey Creek 115 kV SS. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Terrell

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Walk Ikey Creek 115 kV SS

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.