Briefing on Bear Bin Solar

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2023-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Bear Bin Solar is a 150 MW Solar project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2023-12-31.

Queue ID
GTC-GI-125
Location
Terrell, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
Walk Ikey Creek 115 kV SS

What stands out

1

Bear Bin Solar is a 150 MW Solar project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2023-12-31.

Market and operating context

Queue date
2019-10-04
Proposed COD
2023-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Bear Bin Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-125
LocationTerrell, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionWalk Ikey Creek 115 kV SS
Queue date2019-10-04
Proposed COD2023-12-31
IA statusFacility Study