Oakhurst Solar Farm
200 MW hybrid in Mitchell, GA · In queue since April 2017 · Proposed COD December 2021
200 MW
Capacity
1
Components
Solar
9y 7m
In Queue
Facility Study
IA Phase
COD target: 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 8m
Schedule
61 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
LBNL proposed commercial operation date (unverified)
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: LBNL proposed COD of December 2021 is the only available date. However, the project is marked as operational in LBNL data despite being in 'Facility Study' IA status, creating an internal inconsistency that cannot be resolved without external sources.
Developer: No developer information available in LBNL snapshot, news extraction yielded no results, and live search returned no relevant findings to identify the project sponsor or operating entity.
Status: LBNL lists status as 'active' with is_operational=true, but the IA status of 'Facility Study' (without IA execution) conflicts with operational designation. Without external validation, defaulting to LBNL's 'active' status.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Oakhurst Solar Farm is a proposed 200 MW solar and battery hybrid project located in Mitchell County, Georgia. The project, developed by an unknown entity, consists of 200 MW of solar generation capacity. It is interconnected to the Georgia Transmission (GTC) system under queue ID GTC-GI-100.
The project entered the GTC interconnection queue on April 19, 2017, with a proposed commercial operation date of December 1, 2021. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Raccoon Creek 230kV Substation. The Oakhurst Solar Farm has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
GA
County
Mitchell
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Raccoon Creek 230kV Sub
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Georgia Power at Wadley GA
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Swainsboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Jakin GA PV
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Oakhurst Solar Farm
Data-driven briefing on Oakhurst Solar Farm — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.