Oakhurst Solar Farm (GTC-GI-100) — Project Summary

Queue ID
GTC-GI-100
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Mitchell, GA
Region
Southeast
Developer
IA Status
Facility Study

Oakhurst Solar Farm

GTC-GI-100BetaActiveSolarBatteryGTCLBNL

200 MW hybrid in Mitchell, GA · In queue since April 2017 · Proposed COD December 2021

BA: SOCONERC: SERCRC: SOCO

200 MW

Capacity

1

Components

Solar

9y 3m

In Queue

Facility Study

IA Phase

COD target: 2021

Interconnection

Total Duration

4y 8m

Schedule

56 months past proposed COD

Facilities Study50%
Queue EntryApr 19, 2017

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-12-01

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2021-12-01
From queue filing
Developer
Status
Active
Active — marked as operational in LBNL data but IA status shows only 'Facility Study' completion, suggesting data inconsistency or misclassification
Financing
Unannounced
Key milestones
COD targetDec 1, 2021Most recent

LBNL proposed commercial operation date (unverified)

About

The Oakhurst Solar Farm is a proposed 200 MW solar and battery hybrid project located in Mitchell County, Georgia. The project, developed by an unknown entity, consists of 200 MW of solar generation capacity. It is interconnected to the Georgia Transmission (GTC) system under queue ID GTC-GI-100.

The project entered the GTC interconnection queue on April 19, 2017, with a proposed commercial operation date of December 1, 2021. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the Raccoon Creek 230kV Substation. The Oakhurst Solar Farm has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization history for this asset — final cost vs plan, COD slip vs original date, and construction duration vs cohort. Retrospective context for the operating risk view above. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

Final cost vs plan
COD vs original date
Construction duration vs cohort
Project Details

State

GA

County

Mitchell

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Raccoon Creek 230kV Sub

Data Source

LBNL

Risk Analytics

Composite operating risk view for this asset — climate hazards across its remaining operating life, observed generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — 10-year P50 trajectory accounting for degradation, observed curtailment, and market conditions, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Degradation-adjusted CF
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this asset — 10-year cashflow projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Oakhurst Solar Farm