Oakhurst Solar Farm
Type
Entity Briefing
Entity
Oakhurst Solar Farm
Generated
2026-10-10T21:28:36.358Z

Briefing on Oakhurst Solar Farm

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
Southeast
Market / region
2021-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Oakhurst Solar Farm is a 200 MW Solar+Battery project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2021-12-01.

Queue ID
GTC-GI-100
Location
Mitchell, Georgia
Technology
Solar+Battery
Market / region
Southeast
Point of interconnection
Raccoon Creek 230kV Sub

What stands out

1

Oakhurst Solar Farm is a 200 MW Solar+Battery project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2021-12-01.

Market and operating context

Queue date
2017-04-19
Proposed COD
2021-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Oakhurst Solar Farm — verified asset snapshot

FieldValue
Queue IDGTC-GI-100
LocationMitchell, Georgia
TechnologySolar+Battery
Market / regionSoutheast
Point of interconnectionRaccoon Creek 230kV Sub
Queue date2017-04-19
Proposed COD2021-12-01
IA statusFacility Study