Mistflower Energy Center Storage (ERCOT-30INR0089) — Project Summary

Queue ID
ERCOT-30INR0089
Capacity
312.85 MW
Technology
Battery
Status
active
Location
Runnels, TX
Region
ERCOT
Developer
Mistflower Energy Center LLC
IA Status
—

Mistflower Energy Center Storage

ERCOT-30INR0089BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

312.85 MW hybrid in Runnels, TX · In queue since February 2026 · Proposed COD June 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

312.85 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Pre-Study0%
Queue EntryFeb 25, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-01

Queue history
30INR0089 · 8 monthly ERCOT reports, Feb 2026 – Sep 2026

Projected COD moved

0 times

Jun 2030 → Jun 2030

Net change

0 months

first report to latest

Capacity

313 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 25, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2030
From queue filing
Developer in saved assessment
Mistflower Energy Center LLC
From queue filing
Status at research time
Active
Active in ERCOT queue (entered Feb 2026, 30INR0089); no IA executed, no public construction or financing activity. Paired with Mistflower Energy Center Solar (30INR0088), POI at Tap 345kV Odysseus – Bluff Creek.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-30inr0089
  2. infrasure.ai/project/ercot-30inr0089-mistflower-energy-center-storage
  3. ercotqueue.com/developer/mistflower-energy-center-llc
  4. app.nrgmap.com/queues/ercot-30inr0089
  5. wattstreet.net/county/tx/runnels-county/

Commercial operation date: All search results (interconnection.fyi, infrasure.ai) simply mirror the ERCOT/LBNL proposed COD of June 1, 2030; no independent developer press release or news gives a different target. Wattstreet and Cleanview show only 2030 or 2030-01, which are derived from the queue data and not independent.

Developer: Every source names Mistflower Energy Center LLC, which is a project-LLC; no parent or operating company was found in any press release or news. The paired Mistflower Energy Center Solar project is under the same LLC, but no sponsor is identified.

Status: LBNL and queue trackers (interconnection.fyi, nrgmap as of Sep 2026) consistently list the project as active. There is no evidence of IA execution, construction, or withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Mistflower Energy Center Storage project is a proposed 312.85 MW hybrid development in Runnels County, Texas. The project, developed by Mistflower Energy Center LLC, consists of battery storage and other unspecified technologies. It is located within the ERCOT region and has interconnection queue ID ERCOT-30INR0089.

The project entered the ERCOT interconnection queue on February 25, 2026, with a proposed commercial operation date of June 1, 2030. The point of interconnection is Tap 345kV 60072 Odysseus – 60040 Bluff Creek. The project's interconnection status is currently listed as active.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Runnels

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mistflower Energy Center LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 60072 Odysseus – 60040 Bluff Creek

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.