MRR Solar
500 MW generation in Pecos, TX · In queue since July 2025 · Proposed COD July 2030
500 MW
Capacity
1
Components
Solar
1y 4m
In Queue
Facility Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-07-01
Projected COD moved
0 times
Jul 2030 → Jul 2030
Net change
0 months
first report to latest
Capacity
500 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
- —·BOULEVARD ASSOCIATES, LLC→Antler Peak Solar, LLCercotqueue.com
Milestones in this assessment
ERCOT standard generation interconnection agreement between AEP Texas Inc. and Antler Peak Solar, LLC (MRR Solar) filed at the PUC on 9/23/2026.
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/Search/Filings?ControlNumber=35077&ItemMatch=0&SortBy=ItemNumber&SortOrder=Descending
- ercotqueue.com/whats-new
- interconnection.fyi/project/ercot-30inr0053
- ercotqueue.com/project/30INR0053
- infrasure.ai/project/ercot-30inr0053-mrr-solar
Commercial operation date: Only the LBNL date (2030-07-01) exists. The aggregator sites (interconnection.fyi, cleanview) just repeat it as 'expected online July 2030'. No developer press release or financing-backed target was found.
Developer: The Texas PUC filing for the AEP Texas generation interconnection agreement and the ERCOT Sep 2026 GIS change log both name Antler Peak Solar, LLC as the MRR Solar entity. LBNL and several aggregators still list Boulevard Associates, LLC. Both look like project or shell LLCs, and no ultimate parent was identified.
Status: The ERCOT Sep 2026 GIS report lists MRR Solar (Antler Peak Solar, LLC) as 'IA signed'. PUC Interchange shows an AEP Texas–Antler Peak Solar, LLC (MRR Solar) interconnection agreement filed 9/23/2026. LBNL's 'Facility Study' is out of date.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed MRR Solar project is a 500 MW solar generation facility under development by Boulevard Associates, LLC in Pecos County, Texas. The project is located within the ERCOT region and interconnected at the Solstice Substation #60384, operated by AEP.
The project is listed in the ERCOT interconnection queue as entry ERCOT-30INR0053, with a queue entry date of July 29, 2025. The proposed commercial operation date is July 1, 2030. The project's interconnection status is currently listed as active.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BOULEVARD ASSOCIATES, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Solstice Substation #60384 -AEP
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HOVEY_GEN
- POI Substation
- Solstice Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.