Flurry Gas 1 (ERCOT-29INR0305) — Project Summary

Queue ID
ERCOT-29INR0305
Capacity
109.8 MW
Technology
Gas
Status
active
Location
Midland, TX
Region
ERCOT
Developer
NET Power Canaveral LLC
IA Status
—

Flurry Gas 1

ERCOT-29INR0305BetaActiveGasCombined-CycleERCOTLive · ERCOT

109.8 MW generation in Midland, TX · In queue since February 2026 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

109.8 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Pre-Study0%
Queue EntryFeb 25, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-16

Queue history
29INR0305 · 8 monthly ERCOT reports, Feb 2026 – Sep 2026

Projected COD moved

1 time

Jan 2029 → Apr 2029

Net change

+3 months

first report to latest

Capacity

112 → 110 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 25, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 16, 2029
From queue filing
Developer in saved assessment
NET Power
Filed as NET Power Canaveral LLC
Status at research time
Active
Active — early-stage queue position, no construction or financing announcements yet
Financing
Not recorded

Milestones in this assessment

IA executedFeb 25, 2026Latest in this assessment

Project entered ERCOT interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of April 2029. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing entity 'NET Power Canaveral LLC' is a project-specific LLC. NET Power is the operating company known for developing zero-emission natural gas power plants using the Allam-Fetvedt Cycle technology.

Status: LBNL status shows 'active' with queue date of February 2026. No public announcements found regarding permits, financing, or construction milestones for this specific project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Flurry Gas 1 is a proposed 112 MW gas-fired combined-cycle generation project located in Midland County, Texas. The developer is NET Power Canaveral LLC. This project is listed in the ERCOT interconnection queue as entry ERCOT-29INR0305, with a queue entry date of February 25, 2026, and a proposed commercial operation date of January 31, 2029.

The project is currently listed as active in the interconnection queue. Flurry Gas 1 has been the subject of recent news coverage, with 10 articles categorized as industry, regulatory, and grid-related.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Midland

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NET Power Canaveral LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Midland County Northwest Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.