Briefing on Flurry Gas 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
105 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2029-04-16
Proposed COD
Briefing/projectactive

Flurry Gas 1 is a 105 MW Gas project in Texas, currently active.

NET Power Canaveral LLC is the reported developer. Proposed COD is 2029-04-16.

Queue ID
ERCOT-29INR0305
Location
Midland, Texas
Technology
Gas
Developer
NET Power Canaveral LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01

What stands out

1

Flurry Gas 1 is a 105 MW Gas project in Texas with status active.

2

NET Power Canaveral LLC is the reported developer.

3

proposed COD is 2029-04-16.

Market and operating context

Queue date
2026-02-25
Proposed COD
2029-04-16

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Flurry Gas 1 — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0305
LocationMidland, Texas
TechnologyGas
DeveloperNET Power Canaveral LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 1185 Midland County Northwest Switch (bus #1185) – Midland East (bus #1021) 345 kV Line Ckt 01
Queue date2026-02-25
Proposed COD2029-04-16