Lightcycle Energy Storage (ERCOT-29INR0249) — Project Summary

Queue ID
ERCOT-29INR0249
Capacity
409.69 MW
Technology
Battery
Status
active
Location
Fayette, TX
Region
ERCOT
Developer
Lightcycle Energy Storage LLC
IA Status
—

Lightcycle Energy Storage

ERCOT-29INR0249BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

409.69 MW hybrid in Fayette, TX · In queue since January 2026 · Proposed COD March 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

409.69 MW

Capacity

0

Components

10 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 2m

Pre-Study0%
Queue EntryJan 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-03-01

Queue history
29INR0249 · 9 monthly ERCOT reports, Jan 2026 – Sep 2026

Projected COD moved

1 time

May 2029 → Mar 2030

Net change

+10 months

first report to latest

Capacity

410 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 13, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 1, 2030
From queue filing
Developer in saved assessment
Lightcycle Energy Storage LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue (entered 2026-01-13), no interconnection agreement executed, listed as 'In study'. No evidence of permits, construction, or financing.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-29inr0249
  2. infrasure.ai/project/ercot-29inr0249-lightcycle-energy-storage
  3. quicksandcheck.com/texas/fayette-county/
  4. ercotqueue.com/project/29INR0249
  5. ercotqueue.com/developer/lightcycle-energy-storage-llc

Commercial operation date: No press release, news item, or developer statement gives a COD. Quicksandcheck and interconnection.fyi repeat the LBNL date of Mar 2030. One Infrasure page shows May 2029 and another shows 2029, but those are queue aggregators, not financing-backed developer targets, so they do not override the filing. That 1-year gap would be minor anyway.

Developer: Every source names Lightcycle Energy Storage LLC, and all of them trace back to the queue filing. No parent, sponsor, or operating company has been identified, so it may be a shell entity whose backer is unknown.

Status: LBNL, ercotqueue.com, interconnection.fyi, and Quicksandcheck all list the project as active or in study, with no IA. Nothing indicates withdrawal or advancement beyond the study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lightcycle Energy Storage is a proposed hybrid energy project in Fayette County, Texas, being developed by Lightcycle Energy Storage LLC. The project, identified as ERCOT-29INR0249 in the ERCOT interconnection queue, consists of 409.69 MW of battery energy storage. The project entered the queue on January 13, 2026, and has a proposed commercial operation date of May 1, 2029.

The project is currently listed as active in the ERCOT queue. The point of interconnection is the 9042 Winchester 345 kV substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Fayette

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lightcycle Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

9073 HOLMAN 345 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Holman Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.