Enfinity Redbud Storage
516.05 MW hybrid in Comal, TX · In queue since February 2026 · Proposed COD December 2029
516.05 MW
Capacity
0
Components
9 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-18
Projected COD moved
0 times
Dec 2029 → Dec 2029
Net change
0 months
first report to latest
Capacity
516 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-29inr0242-enfinity-redbud-storage
- interconnection.fyi/project/ercot-29inr0242
- ercotqueue.com/project/29INR0242
- ercotqueue.com/developer/eg-redbud-llc
- app.nrgmap.com/queues/ercot-29inr0242
- cleanview.co/power-projects/planned/battery-storage-projects/texas/29INR0242/enfinity-redbud-storage
Commercial operation date: Every source that gives a date (infrasure.ai, interconnection.fyi, cleanview.co) repeats the ERCOT/LBNL proposed COD of 2029-12-18, so none is independent. No press release or developer announcement gives a different target.
Developer: The project name 'Enfinity Redbud Storage' and the 'EG' prefix on the filing LLC suggest the parent is Enfinity Global. This is inferred from naming only, and no source explicitly states the ownership link.
Status: LBNL and several trackers (NRG Map, ercotqueue.com, interconnection.fyi) agree the status is active with no IA. The interxdata.com 'operational' label conflicts with all of them and with the 2029 COD, so it is likely a data error and was ignored.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Enfinity Redbud Storage project is a proposed 516.05 MW hybrid development in Comal County, Texas. The project, being developed by EG Redbud LLC, consists of battery energy storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0242, with a queue entry date of February 10, 2026, and a proposed commercial operation date of December 18, 2029.
The point of interconnection for the project is the 345kV Hays Energy (7043) to 345kV Bergheim (7770) line.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Comal
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
EG Redbud LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345kV Hays Energy (7043) - 345kV Bergheim (7770)
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.