Brazos Energy Center 1
300.6 MW hybrid in McLennan, TX · In queue since January 2026 · Proposed COD September 2029
300.6 MW
Capacity
0
Components
10 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-18
Projected COD moved
1 time
Jun 2029 → Sep 2029
Net change
+3 months
first report to latest
Capacity
300 → 301 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/29INR0229/brazos-energy-center-1
- groundtrace.io/developers/ferrovial-energy-us-1-pqlcv6hx5ht2y
- cleanview.co/power-projects/developers/ferrovial
- interconnection.fyi/projects/market/ERCOT
Commercial operation date: Only LBNL gives a specific date (2029-09-18). Cleanview lists 'Expected online 2029', but it appears to be derived from the same queue data and is not an independent post-LBNL signal. No press release or news confirms a different target.
Developer: The LBNL filing entity 'Ferrovial Energy US 1' is a project/holding entity, and Cleanview and Groundtrace list the project under Ferrovial's development pipeline. No press release confirms a different operating company. The LS Power/Brazos Valley results concern an unrelated gas plant.
Status: LBNL shows active status with no IA. Third-party trackers (Groundtrace, Cleanview) list it as queued/planned, consistent with early-stage development.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Brazos Energy Center 1 is a proposed 300.76 MW hybrid energy project located in McLennan County, Texas. Developed by Ferrovial Energy US 1, the project consists of battery energy storage and other unspecified technologies. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0229, with a queue entry date of January 13, 2026, and a proposed commercial operation date of September 18, 2029.
The project is listed as a hybrid project in the ERCOT queue. Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
McLennan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Ferrovial Energy US 1
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Brazos Energy Center 1
Data-driven briefing on Brazos Energy Center 1 — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.