Query
Brazos Energy Center 1
Type
Entity Briefing
Entity
Brazos Energy Center 1
Generated
2026-10-19T18:10:55.709Z

Briefing on Brazos Energy Center 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
301 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-09-18
Proposed COD
Briefing/projectactive

Brazos Energy Center 1 is a 301 MW Battery project in Texas, currently active.

Ferrovial Energy US 1 is the reported developer. Proposed COD is 2029-09-18.

Queue ID
ERCOT-29INR0229
Location
McLennan, Texas
Technology
Battery
Developer
Ferrovial Energy US 1
Market / region
ERCOT
Point of interconnection
Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>

What stands out

1

Brazos Energy Center 1 is a 301 MW Battery project in Texas with status active.

2

Ferrovial Energy US 1 is the reported developer.

3

proposed COD is 2029-09-18.

Market and operating context

Queue date
2026-01-13
Proposed COD
2029-09-18

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Brazos Energy Center 1 — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0229
LocationMcLennan, Texas
TechnologyBattery
DeveloperFerrovial Energy US 1
Market / regionERCOT
Point of interconnectionTap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5>
Queue date2026-01-13
Proposed COD2029-09-18