Cenizo Solar (ERCOT-29INR0219) — Project Summary

Queue ID
ERCOT-29INR0219
Capacity
301.39 MW
Technology
Solar
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Renew Development Holdco, LLC
IA Status
Facility Study

Cenizo Solar

ERCOT-29INR0219BetaActiveSolarERCOTLBNL + Live

301.39 MW generation in Webb, TX · In queue since November 2025 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.39 MW

Capacity

1

Components

Solar

1 year

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Facilities Study50%
Queue EntryNov 24, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

Queue history
29INR0219 · 11 monthly ERCOT reports, Nov 2025 – Sep 2026

Projected COD moved

0 times

Dec 2029 → Dec 2029

Net change

0 months

first report to latest

Capacity

301 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedNov 24, 2025
Interconnection agreement signedSep 28, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2029
From queue filing
Developer in saved assessment
Renew Development Holdco, LLC
Sources agreed at research time
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. It would tap the 345 kV Cenizo–Cruce line. No construction or permitting news was found.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/29INR0219/cenizo-solar
  2. ercotqueue.com/project/29INR0219
  3. ercotqueue.com/developer/renew-development-holdco-llc
  4. interconnection.fyi/project/ercot-29inr0219
  5. infrasure.ai/project/ercot-29inr0219-cenizo-solar

Commercial operation date: LBNL proposed COD is 2029-12-31, and Cleanview says 'Expected online 2029'. Cleanview is an aggregator that likely draws on the same queue data, so this is weak corroboration and not an independent developer-backed target.

Developer: The ercotqueue.com developer page and infrasure.ai both list Renew Development Holdco, LLC, matching LBNL. The ercotqueue.com project page names the project entity as Cenizo Energy Center LLC. No press release identifies a distinct operating parent, so I did not infer one.

Status: LBNL and the ERCOT queue trackers (interconnection.fyi, ercotqueue.com) show the project as active and not operational. One aggregator (interxdata) says 'operational', which contradicts the study-stage status and the 2029 COD, so I treated it as unreliable. The trackers also disagree on IA stage ('IA, FIS pending' vs 'No IA').

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cenizo Solar project is a proposed 301.39 MW solar generation project located in Webb County, Texas. Developed by Renew Development Holdco, LLC, the project consists of photovoltaic solar technology. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0219, with a queue entry date of November 24, 2025, and a proposed commercial operation date of December 31, 2029.

The point of interconnection for the Cenizo Solar project is the Tap 345 kV 80220 Cenizo - 80079 Cruce. The project is listed in the ERCOT queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Renew Development Holdco, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 80220 Cenizo - 80079 Cruce

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Cenizo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.