Kickstart Energy Storage V
999 MW storage in Ellis, TX · In queue since November 2025 · Proposed COD December 2029
999 MW
Capacity
1
Components
Battery
1 year
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Projected COD moved
0 times
Dec 2029 → Dec 2029
Net change
0 months
first report to latest
Capacity
999 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (7 recorded sources)
low confidence at research time
- ercotqueue.com/project/29INR0217
- ercotqueue.com/developer/kickstart-infrastructure-llc
- gridglasses.com/storage
- quicksandcheck.com/texas/ellis-county/
- cleanview.co/power-projects/planned/battery-storage-projects/texas/29INR0217/kickstart-energy-storage-v
- interconnection.fyi/projects/state/TX/ellis-county
- infrasure.ai/project/ercot-29inr0217-kickstart-energy-storage-v
Commercial operation date: Aggregator sites (GridGlasses 'online 2029-12', Cleanview 'Expected online 2029', Quicksand Check 'Dec 2029') all repeat the ERCOT/LBNL queue date. No developer press release or news gives an independent, financing-backed target.
Developer: All project-level sources (ercotqueue.com, infrasure.ai, GridGlasses, Quicksand Check) list Kickstart Infrastructure LLC. No parent or operating company was found. The news-extracted 'HyVelocity Hub' is a DOE hydrogen hub and unrelated to this battery project, so it was disregarded.
Status: LBNL, interconnection.fyi and Quicksand Check ('In study') all show an active, early-stage queue entry. No evidence of withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Kickstart Energy Storage V is a proposed 999 MW hybrid energy project in Ellis County, Texas. Developed by Kickstart Infrastructure LLC, the project consists of battery energy storage and another unspecified technology. It is located within the ERCOT region and interconnected at the 345 KV Venus 1906 to Fort Smith 3389 point of interconnection.
The project, identified as ERCOT-29INR0217 in the ERCOT interconnection queue, entered the queue on November 24, 2025. Its proposed commercial operation date is December 31, 2029. The project's interconnection status is currently active.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Ellis
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Kickstart Infrastructure LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
345 KV Venus 1906 to Fort Smith 3389
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.