Glass Mountain Solar 2
304.3 MW generation in Pecos, TX · In queue since September 2025 · Proposed COD February 2029
304.3 MW
Capacity
1
Components
Solar
1y 2m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-02-05
Projected COD moved
3 times
Mar 2029 → Feb 2029
Net change
-1 months
first report to latest
Capacity
304 → 302 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-29inr0182-glass-mountain-solar-2
- interconnection.fyi/project/ercot-29inr0182
- glassmountainenergy.com/
Commercial operation date: The LBNL proposed COD is 2029-02-05. interconnection.fyi shows Feb 2029, infrasure.ai shows 2029-03-22, and the Apex Clean Energy Glass Mountain Energy page lists 2029. The two aggregators derive from the same queue data, so only the Apex page is a semi-independent signal. All point to 2029, and no financing-backed target differs.
Developer: Apex Clean Energy's Glass Mountain Energy page describes a Pecos County, TX hybrid project (500 MW wind + 300 MW solar, 2029). That matches the name, county, solar size and timing of this 304 MW filing by Glass Mountain Solar, LLC. No source states the link explicitly, so this attribution is an inference.
Status: LBNL and the aggregators (infrasure.ai, interconnection.fyi) all list the project as active. The queue entry is from Sept 2025, and no news shows a permit, financing or construction start.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Glass Mountain Solar 2 is a proposed 304.3 MW solar generation project located in Pecos County, Texas. The project, being developed by Glass Mountain Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-29INR0182. It entered the interconnection queue on September 22, 2025, with a proposed commercial operation date of March 22, 2029.
The project is currently listed as active in the interconnection queue. Recent news coverage indicates industry interest in the development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Glass Mountain Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 60404 SOLSTICE - 18669 TOYAHCRK_5
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HOVEY_GEN
- POI Substation
- Solstice Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.