Glass Mountain Solar 2 (ERCOT-29INR0182) — Project Summary

Queue ID
ERCOT-29INR0182
Capacity
304.3 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
Glass Mountain Solar, LLC
IA Status
Facility Study

Glass Mountain Solar 2

ERCOT-29INR0182BetaActiveSolarERCOTLBNL + Live

304.3 MW generation in Pecos, TX · In queue since September 2025 · Proposed COD February 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

304.3 MW

Capacity

1

Components

Solar

1y 2m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Facilities Study50%
Queue EntrySep 22, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-05

Queue history
29INR0182 · 13 monthly ERCOT reports, Sep 2025 – Sep 2026

Projected COD moved

3 times

Mar 2029 → Feb 2029

Net change

-1 months

first report to latest

Capacity

304 → 302 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 22, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 5, 2029
From queue filing
Developer in saved assessment
Apex Clean Energy
Filed as Glass Mountain Solar, LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study phase. No interconnection agreement is executed and no construction has been announced.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-29inr0182-glass-mountain-solar-2
  2. interconnection.fyi/project/ercot-29inr0182
  3. glassmountainenergy.com/

Commercial operation date: The LBNL proposed COD is 2029-02-05. interconnection.fyi shows Feb 2029, infrasure.ai shows 2029-03-22, and the Apex Clean Energy Glass Mountain Energy page lists 2029. The two aggregators derive from the same queue data, so only the Apex page is a semi-independent signal. All point to 2029, and no financing-backed target differs.

Developer: Apex Clean Energy's Glass Mountain Energy page describes a Pecos County, TX hybrid project (500 MW wind + 300 MW solar, 2029). That matches the name, county, solar size and timing of this 304 MW filing by Glass Mountain Solar, LLC. No source states the link explicitly, so this attribution is an inference.

Status: LBNL and the aggregators (infrasure.ai, interconnection.fyi) all list the project as active. The queue entry is from Sept 2025, and no news shows a permit, financing or construction start.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Glass Mountain Solar 2 is a proposed 304.3 MW solar generation project located in Pecos County, Texas. The project, being developed by Glass Mountain Solar, LLC, is interconnected within the ERCOT region under queue ID ERCOT-29INR0182. It entered the interconnection queue on September 22, 2025, with a proposed commercial operation date of March 22, 2029.

The project is currently listed as active in the interconnection queue. Recent news coverage indicates industry interest in the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Glass Mountain Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 60404 SOLSTICE - 18669 TOYAHCRK_5

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HOVEY_GEN
POI Substation
Solstice Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.