Estrella Dorada Wind
306 MW generation in Duval, TX · In queue since July 2025 · Proposed COD July 2029
306 MW
Capacity
1
Components
Wind
1y 4m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-13
Projected COD moved
0 times
Jul 2029 → Jul 2029
Net change
0 months
first report to latest
Capacity
300 → 306 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-29inr0146-estrella-dorada-wind
- ercotqueue.com/project/29INR0146
- ercotqueue.com/developer/estrella-dorada-wind-farm-llc
- cleanview.co/power-projects/planned/wind-farms/texas/29INR0146/estrella-dorada-wind
- app.nrgmap.com/queues/ercot-29inr0146
- quicksandcheck.com/texas/duval-county/
Commercial operation date: Only the ERCOT/LBNL filing gives a COD (July 13, 2029). The aggregator pages (infrasure.ai, cleanview.co) simply repeat that date and are not independent post-LBNL signals. No developer press release or news item supports a different date.
Developer: Every source names Estrella Dorada Wind Farm, LLC as the developer, and all of them derive from the ERCOT filing. No parent or operating company was found in press or corporate announcements.
Status: LBNL lists the project as active, and ercotqueue.com, interconnection.fyi, and NRG Map all show it active with no IA. The interxdata 'operational' snippet conflicts with this, but it is most likely a data error given the 2025 queue date and Facility Study status.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Estrella Dorada Wind project is a proposed 306 MW wind generation facility in Duval County, Texas. The project, developed by Estrella Dorada Wind Farm, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0146, with a queue entry date of July 21, 2025. The proposed commercial operation date is July 13, 2029.
The point of interconnection for the project is Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2. The project utilizes wind turbine technology. The Estrella Dorada Wind project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Duval
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Estrella Dorada Wind Farm, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.