Estrella Dorada Wind (ERCOT-29INR0146) — Project Summary

Queue ID
ERCOT-29INR0146
Capacity
306 MW
Technology
Wind
Status
active
Location
Duval, TX
Region
ERCOT
Developer
Estrella Dorada Wind Farm, LLC
IA Status
Facility Study

Estrella Dorada Wind

ERCOT-29INR0146BetaActiveWindERCOTLBNL + Live

306 MW generation in Duval, TX · In queue since July 2025 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

306 MW

Capacity

1

Components

Wind

1y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryJul 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-13

Queue history
29INR0146 · 15 monthly ERCOT reports, Jul 2025 – Sep 2026

Projected COD moved

0 times

Jul 2029 → Jul 2029

Net change

0 months

first report to latest

Capacity

300 → 306 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 21, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 13, 2029
From queue filing
Developer in saved assessment
Estrella Dorada Wind Farm, LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no executed interconnection agreement, no construction or financing announced (ercotqueue.com estimates an 11% build chance).
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-29inr0146-estrella-dorada-wind
  2. ercotqueue.com/project/29INR0146
  3. ercotqueue.com/developer/estrella-dorada-wind-farm-llc
  4. cleanview.co/power-projects/planned/wind-farms/texas/29INR0146/estrella-dorada-wind
  5. app.nrgmap.com/queues/ercot-29inr0146
  6. quicksandcheck.com/texas/duval-county/

Commercial operation date: Only the ERCOT/LBNL filing gives a COD (July 13, 2029). The aggregator pages (infrasure.ai, cleanview.co) simply repeat that date and are not independent post-LBNL signals. No developer press release or news item supports a different date.

Developer: Every source names Estrella Dorada Wind Farm, LLC as the developer, and all of them derive from the ERCOT filing. No parent or operating company was found in press or corporate announcements.

Status: LBNL lists the project as active, and ercotqueue.com, interconnection.fyi, and NRG Map all show it active with no IA. The interxdata 'operational' snippet conflicts with this, but it is most likely a data error given the 2025 queue date and Facility Study status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Estrella Dorada Wind project is a proposed 306 MW wind generation facility in Duval County, Texas. The project, developed by Estrella Dorada Wind Farm, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0146, with a queue entry date of July 21, 2025. The proposed commercial operation date is July 13, 2029.

The point of interconnection for the project is Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2. The project utilizes wind turbine technology. The Estrella Dorada Wind project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Duval

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Estrella Dorada Wind Farm, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 80079 Cruce - 5901 San Miguel Ckt 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform