Elysium Energy Center BESS (ERCOT-29INR0145) — Project Summary

Queue ID
ERCOT-29INR0145
Capacity
100 MW
Technology
Battery
Status
active
Location
Fort Bend, TX
Region
ERCOT
Developer
Adapture Solar Development
IA Status
—

Elysium Energy Center BESS

ERCOT-29INR0145BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

100 MW hybrid in Fort Bend, TX · In queue since April 2025 · Proposed COD January 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100 MW

Capacity

0

Components

1y 7m

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Pre-Study0%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-01-17

Queue history
29INR0145 · 9 monthly ERCOT reports, Jan 2026 – Sep 2026

Projected COD moved

0 times

Jan 2030 → Jan 2030

Net change

0 months

first report to latest

Capacity

100 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 21, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2030
From queue filing
Developer in saved assessment
Adapture Solar Development
From queue filing
Status at research time
Active
Active — recently entered ERCOT queue (April 2025), early-stage development with no public construction timeline
Financing
Not recorded

Milestones in this assessment

IA executedApr 21, 2025Latest in this assessment

Project entered ERCOT interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2030-01-17. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'Adapture Solar Development' as developer. No news coverage found to confirm if this is an operating company name or project LLC, but name structure suggests it's the actual developer entity.

Status: LBNL status shows 'active' with queue entry date of April 21, 2025. This is a very recent filing with no subsequent news coverage, indicating early-stage development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Elysium Energy Center BESS is a proposed 100 MW battery energy storage project located in Fort Bend County, Texas. Developed by Adapture Solar Development, the project is a hybrid development in the ERCOT interconnection queue under queue ID ERCOT-29INR0145. The project entered the queue on April 21, 2025, with a proposed commercial operation date of January 17, 2030.

The project is currently listed as active in the ERCOT queue. The point of interconnection is the 44030 Arcola 138 kV substation. The project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Fort Bend

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Adapture Solar Development

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44030 Arcola 138 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
POI Substation
Arcola Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.