Briefing on Elysium Energy Center BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2030-01-17
Proposed COD
Briefing/projectactive

Elysium Energy Center BESS is a 100 MW Battery project in Texas, currently active.

Adapture Solar Development is the reported developer. Proposed COD is 2030-01-17.

Queue ID
ERCOT-29INR0145
Location
Fort Bend, Texas
Technology
Battery
Developer
Adapture Solar Development
Market / region
ERCOT
Point of interconnection
44030 Arcola 138 kV

What stands out

1

Elysium Energy Center BESS is a 100 MW Battery project in Texas with status active.

2

Adapture Solar Development is the reported developer.

3

proposed COD is 2030-01-17.

Market and operating context

Queue date
2025-04-21
Proposed COD
2030-01-17

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Elysium Energy Center BESS — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0145
LocationFort Bend, Texas
TechnologyBattery
DeveloperAdapture Solar Development
Market / regionERCOT
Point of interconnection44030 Arcola 138 kV
Queue date2025-04-21
Proposed COD2030-01-17