Caesar Storage (ERCOT-29INR0132) — Project Summary

Queue ID
ERCOT-29INR0132
Capacity
205.5 MW
Technology
Solar+Battery
Status
active
Location
Borden, TX
Region
ERCOT
Developer
Caesar Solar, LLC
IA Status
Facility Study

Caesar Storage

ERCOT-29INR0132BetaActiveBatteryBatteryERCOTLBNL + Live

205.5 MW generation in Borden, TX · In queue since July 2025 · Proposed COD November 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.5 MW

Capacity

1

Components

Battery

1y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Facilities Study50%
Queue EntryJul 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-11-26

Queue history
29INR0132 · 15 monthly ERCOT reports, Jul 2025 – Sep 2026

Projected COD moved

0 times

Nov 2029 → Nov 2029

Net change

0 months

first report to latest

Capacity

206 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 29, 2025
Interconnection agreement signedSep 15, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achievedSolar Power World · 2026-01-20

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 26, 2029
From queue filing
Developer in saved assessment
Caesar Solar, LLC
From queue filing
Status at research time
Active
Active — early-stage Facility Study phase, queue entry dated July 2025
Financing
Not recorded

Milestones in this assessment

IA executedJul 29, 2025Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of November 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing identifies 'Caesar Solar, LLC' as developer. No news coverage or corporate announcements found to identify parent company or confirm operating entity structure.

Status: LBNL shows 'active' status in Facility Study phase with recent queue entry (July 2025). No contradicting information found in research.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Caesar Storage project is a proposed 205.5 MW hybrid battery energy storage project located in Borden County, Texas. Developed by Caesar Solar, LLC, it is listed in the ERCOT interconnection queue as entry ERCOT-29INR0132, with a queue entry date of July 29, 2025. The proposed commercial operation date is November 26, 2029.

The project is currently listed as active in the interconnection queue. It is a hybrid project that includes battery energy storage along with another unspecified technology. The point of interconnection is the 59916 Buck Canyon 345 kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Caesar Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

59916 Buck Canyon 345 kV

Data Source

LBNL + Live

DeveloperEstuary PowerSolar Power World · 2026-01-20
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.