Briefing/projectactive
Caesar Storage is a 206 MW Solar+Battery project in Texas, currently active.
Caesar Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-11-26.
- Queue ID
- ERCOT-29INR0132
- Location
- Borden, Texas
- Technology
- Solar+Battery
- Developer
- Caesar Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- 59916 Buck Canyon 345 kV
What stands out
1
Caesar Storage is a 206 MW Solar+Battery project in Texas with status active.
2
Caesar Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-11-26.
4
Latest linked story: “Desert solar project now feeding power to Las Vegas casinos” (Solar Power World, 2026-01-20).
Market and operating context
- Queue date
- 2025-07-29
- Proposed COD
- 2029-11-26
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.