Apricot Sun Storage (ERCOT-29INR0125) — Project Summary

Queue ID
ERCOT-29INR0125
Capacity
301.02 MW
Technology
Solar+Battery
Status
active
Location
Duval, TX
Region
ERCOT
Developer
Apricot Sun Energy Center, LLC
IA Status
Facility Study

Apricot Sun Storage

ERCOT-29INR0125BetaActiveBatteryBatteryERCOTLBNL + Live

301.02 MW generation in Duval, TX · In queue since April 2025 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

301.02 MW

Capacity

1

Components

Battery

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Facilities Study50%
Queue EntryApr 1, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-30

Queue history
29INR0125 · 19 monthly ERCOT reports, Mar 2025 – Sep 2026

Projected COD moved

0 times

Sep 2029 → Sep 2029

Net change

0 months

first report to latest

Capacity

313 → 201 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 1, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 30, 2029
From queue filing
Developer in saved assessment
Apricot Sun Energy Center, LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no interconnection agreement executed (ercotqueue.com lists 'No IA', 1% build-chance); no construction or financing announcements found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-29inr0125-apricot-sun-storage
  2. interconnection.fyi/project/ercot-29inr0125
  3. ercotqueue.com/project/29INR0125
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/29INR0125/apricot-sun-storage

Commercial operation date: Only the LBNL/ERCOT queue date (2029-09-30) exists. The aggregator sites (infrasure, cleanview, interconnection.fyi) repeat the same queue-derived 2029 target and are not independent developer-backed signals.

Developer: All sources list only the project LLC, Apricot Sun Energy Center, LLC. No press release or news names a parent or operating company. The Shell developer page in the results is not tied to this project.

Status: LBNL lists the status as active and the aggregators agree (infrasure, interconnection.fyi). Nothing in the results indicates withdrawal, construction, or an executed IA.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Apricot Sun Storage project is a proposed hybrid energy project located in Duval County, Texas. Developed by Apricot Sun Energy Center, LLC, the project has a total capacity of 200.84 MW and consists of battery energy storage. It is listed in the ERCOT interconnection queue as entry ERCOT-29INR0125, with a queue entry date of April 1, 2025, and a proposed commercial operation date of September 30, 2029.

The project is currently listed as active in the interconnection queue. The point of interconnection is Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Duval

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Apricot Sun Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 80079 (Cruce) - 5901 (San Miguel) 345 kV Ckt 1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.