Bendito Wind
300 MW generation in Webb, TX · In queue since July 2025 · Proposed COD July 2029
300 MW
Capacity
1
Components
Wind
1y 4m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-13
Projected COD moved
0 times
Jul 2029 → Jul 2029
Net change
0 months
first report to latest
Capacity
300 MW
unchanged in the reports
Latest stage
Cancelled
last listed Jul 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- infrasure.ai/project/ercot-29inr0117-bendito-wind
- interconnection.fyi/project/ercot-29inr0117
- ercotqueue.com/developer/bendito-wind-farm-llc
- cleanview.co/power-projects/planned/wind-farms/texas/29INR0117/bendito-wind
- bizapedia.com/de/bendito-wind-farm-llc.html
- interxdata.com/projects/bendito-wind-ercot-gis-report-29inr0117/
Commercial operation date: Only the LBNL/ERCOT filing gives a specific date (2029-07-13). Aggregators such as cleanview ('Expected online 2029') and interconnection.fyi (July 2029) appear to repeat the queue data, not an independent developer target. No press release or news gives a financing-backed COD.
Developer: Every source names Bendito Wind Farm, LLC, a Delaware LLC formed 2024-02-27 with a registered agent only. No parent or operating company is identified. The Scout/Oracle result concerns the unrelated Ranchero Wind Farm.
Status: LBNL and ercotqueue.com (1 active, 0 dropped) show the project as active. The withdrawn and operational labels from aggregators are contradictory and unverified, so the LBNL value is kept. The withdrawn flag is worth rechecking against the ERCOT queue.
About
Generated Apr 10, 2026 · Predates Jul 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Bendito Wind project is a proposed 300 MW wind generation facility in Webb County, Texas. Developed by Bendito Wind Farm, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0117, with a queue entry date of July 29, 2025. The proposed commercial operation date is July 13, 2029.
The point of interconnection for the Bendito Wind project is the Tap 345 kV80220 Cenizo - 80079 Cruce Ckt 2. There has been recent news coverage of the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jul 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Bendito Wind Farm, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345 kV80220 Cenizo - 80079 Cruce Ckt 2
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Cenizo Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Bendito Wind queue pipeline — 1 projects by technology and status
Data-driven briefing on Bendito Wind — fleet, generation, financial, and news signals.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.