Bendito Wind (ERCOT-29INR0117) — Project Summary

Queue ID
ERCOT-29INR0117
Capacity
300 MW
Technology
Wind
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Bendito Wind Farm, LLC
IA Status
Facility Study

Bendito Wind

ERCOT-29INR0117BetaActiveWindERCOTLBNL

300 MW generation in Webb, TX · In queue since July 2025 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

300 MW

Capacity

1

Components

Wind

1y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Facilities Study50%
Queue EntryJul 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-13

Queue history
29INR0117 · 13 monthly ERCOT reports, Jul 2025 – Jul 2026

Projected COD moved

0 times

Jul 2029 → Jul 2029

Net change

0 months

first report to latest

Capacity

300 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jul 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 29, 2025
CancelledAug 26, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 13, 2029
From queue filing
Developer in saved assessment
Bendito Wind Farm, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at Facility Study stage with no IA executed. No construction or permitting news was found. One aggregator (interconnection.fyi) lists it as withdrawn, and another (interxdata) lists it as operational, which is implausible for a 2025 queue entry.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-29inr0117-bendito-wind
  2. interconnection.fyi/project/ercot-29inr0117
  3. ercotqueue.com/developer/bendito-wind-farm-llc
  4. cleanview.co/power-projects/planned/wind-farms/texas/29INR0117/bendito-wind
  5. bizapedia.com/de/bendito-wind-farm-llc.html
  6. interxdata.com/projects/bendito-wind-ercot-gis-report-29inr0117/

Commercial operation date: Only the LBNL/ERCOT filing gives a specific date (2029-07-13). Aggregators such as cleanview ('Expected online 2029') and interconnection.fyi (July 2029) appear to repeat the queue data, not an independent developer target. No press release or news gives a financing-backed COD.

Developer: Every source names Bendito Wind Farm, LLC, a Delaware LLC formed 2024-02-27 with a registered agent only. No parent or operating company is identified. The Scout/Oracle result concerns the unrelated Ranchero Wind Farm.

Status: LBNL and ercotqueue.com (1 active, 0 dropped) show the project as active. The withdrawn and operational labels from aggregators are contradictory and unverified, so the LBNL value is kept. The withdrawn flag is worth rechecking against the ERCOT queue.

About

Saved background

Generated Apr 10, 2026 · Predates Jul 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Bendito Wind project is a proposed 300 MW wind generation facility in Webb County, Texas. Developed by Bendito Wind Farm, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0117, with a queue entry date of July 29, 2025. The proposed commercial operation date is July 13, 2029.

The point of interconnection for the Bendito Wind project is the Tap 345 kV80220 Cenizo - 80079 Cruce Ckt 2. There has been recent news coverage of the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jul 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bendito Wind Farm, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV80220 Cenizo - 80079 Cruce Ckt 2

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Cenizo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.