Peach Creek Solar (ERCOT-29INR0082) — Project Summary

Queue ID
ERCOT-29INR0082
Capacity
300 MW
Technology
Solar
Status
active
Location
Wharton, TX
Region
ERCOT
Developer
Acciona Energy USA Global LLC
IA Status
Facility Study

Peach Creek Solar

ERCOT-29INR0082BetaActiveSolarERCOTLBNL + Live

300 MW generation in Wharton, TX · In queue since December 2024 · Proposed COD September 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

300 MW

Capacity

1

Components

Solar

1y 11m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Facilities Study50%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-30

Queue history
29INR0082 · 10 monthly ERCOT reports, Dec 2025 – Sep 2026

Projected COD moved

1 time

Jul 2028 → Sep 2029

Net change

+14 months

first report to latest

Capacity

300 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 19, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 30, 2029
From queue filing
Developer in saved assessment
Acciona Energy
Filed as Acciona Energy USA Global LLC
Status at research time
Active
Active in ERCOT queue, Facility Study phase, no interconnection agreement executed; no public construction or permitting news found.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. infrasure.ai/project/ercot-29inr0082-peach-creek-solar
  2. bizapedia.com/tx/aeug-peach-creek-solar-llc.html
  3. interconnection.fyi/project/ercot-29inr0082

Commercial operation date: Only the LBNL filing gives a COD (proposed 2029-09-30). The InfraSure page repeats it as 'Proposed COD September 2029' and appears to be derived from LBNL, so it is not an independent confirmation. No press release or news item gives a different target.

Developer: LBNL lists Acciona Energy USA Global LLC, the US holding/operating arm of Acciona Energy. A Texas foreign LLC registration, 'AEUG Peach Creek Solar LLC' (AEUG likely stands for Acciona Energy USA Global), points to a project-specific entity under Acciona. No press release confirms the developer.

Status: LBNL and the interconnection.fyi and InfraSure listings all show the project as active at the Facility Study stage with no IA date. No evidence of withdrawal or construction start.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Peach Creek Solar is a proposed 300 MW solar generation project located in Wharton County, Texas. The development project is being advanced by Acciona Energy USA Global LLC and consists of a single solar photovoltaic component with a total capacity of 300 MW. The project is planned to connect to the grid at the Bailey 345 kV point of interconnection (identified as 44040 Bailey 345 kV).

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-29INR0082 and entered the queue on December 19, 2024. Its status in the queue is active, and its interconnection request is currently in the Facility Study phase. The proposed commercial operation date for Peach Creek Solar is September 30, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Wharton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Acciona Energy USA Global LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

44040 Bailey 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Eldorado Shell Bailey Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.